Site work and paving for a mixed-use development in Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Qualified bidders shall have the necessary equipment and experience to replace lead service lines using trenchless methods including, but not limited to, the following (Pulling, Hole Hogging, Boring, Directional Drilling, and Pipe Bursting). Service line replacement locations may be selected based upon upcoming paving projects, appearance of new childcares, or based on emergency leak/failure. Each location will require either the full replacement of the water service line from the municipal water main up to the interior water meter setting, or, at locations where a portion of the service line was previously replaced with copper, the replacement of the remaining lead portion of the service line. When the existing water meter setting is not code compliant, work will also include a new meter setting. Work may include, but is not limited to, the procurement of all necessary permits, a site visit prior to work beginning, scheduling the installation with the property owner, traffic control, erosion control, saw-cutting, excavation, installation of a new copper service line utilizing trenchless technology (MWW approval is required for open cut installation), tapping of the water main, abandonment of the lead service line, installation of an updated water meter setting up to and including the outlet valve, reconnection to the interior building piping, code-compliant restoration of the electrical ground wire, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Temporary and permanent restoration requirements will be at the discretion of MWW. The contractor will be requested to provide a second crew under this contract if the required emergency replacements exceed the capacity of one crew. Locations will be at various sites throughout the City of Milwaukee. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations. Time for Completion: The contractor shall begin scheduling work immediately following contract execution. All work, including site restoration, must be completed by August 5, 2022. The contractor will be required to mobilize to the designated location within 48 hours of notification and substantially complete the replacement within three City business days of notification. Substantial completion is considered restoration of water service to the property with a copper water service and backfilling all excavations. A maximum of one project working day is allowed for substantial completion at each site. Permanent restoration of pavement, curb and gutter, and walk will not be included in project working days if completed within two weeks (weather permitting) of substantial completion. MWW reserves the right to require site restoration immediately following the service installation if deemed necessary for traffic, safety, or public welfare. MWW reserves the right to assess daily contract per diem charges on projects which exceed allowable project working days. If a secondary contractor is utilized to perform work at a project site, MWW reserves the right to assess the cost difference in addition to the per diem. Contract Award: The contract shall be awarded to the lowest responsible bidder whose bid complies with the bid specifications. The Commissioner reserves the right to make an award or awards to one or more additional bidder(s) if in his judgement such award(s) will serve the best interests of the Department in terms of cost and efficiency in completing the necessary work. If any such additional award(s) are made, service line replacement loca- tions will be distributed on an equivalent basis to each contractor. Liquidated Damages, per diem: $371.00 The residency requirement for this project is 40% of all hours worked on the project. One quarter of these hours must be attributable to residents living in the following zip codes: 53204, 53205, 53206, 53208, 53210, 53212, 53215, and 53233. The SBE requirement for this project is 22% of the contract base bid. The SBE Compliance Plan (Form A) must be submitted with the bid and is an element of bid responsiveness. SBE certificates must be submitted with Form A. Incomplete SBE Compliance Plans (Form A) or inaccurate SBE Compliance Plans will not be accepted and will render the bid unresponsive. Bond, Certified Check, Cashier's Check or Cash to accompany bid: 10% of the Contractor's Base Bid. PROJECT NO. WK64409104 (PUBLIC SIDE REPLACEMENT) PROJECT NO. WK64409154 (PRIVATE SIDE REPLACEMENT
Bid Results
Water / Sewer
$649,040.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 9, 2022
April 8, 2022
Multiple Locations, Milwaukee, WI
Related To This Project
Milwaukee, WI
Bid Date: May 09 2022
Milwaukee, WI
Bid Date: Feb 11 2022
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Apr 20 2022
Milwaukee, WI
Bid Date: May 03 2022
Milwaukee, WI
Bid Date: May 06 2022
Milwaukee, WI
Bid Date: May 10 2022
Milwaukee, WI
Bid Date: May 06 2022
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Apr 14 2022
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Apr 22 2022
Milwaukee, WI
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.