BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 22, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a bridge / tunnel in Linwood, Ontario. Completed plans call for site work for a bridge / tunnel.

Rehabilitation of Wallenstein Bridge (Hergott Road) at Conestogo River and Ament Line Bridge at Boomer Creek Bridge. Scope of work includes but not limited to the rehabilitation of two (2) bridge structures and associated works including temporary signals & traffic control; concrete removals (all types); barrier wall, guiderail and end treatment upgrades; concrete overlay; waterproofing; asphalt paving; restoration. Question Deadline: Tue Feb 22, 2022 4:00:00 PM (EST) Documents are available at: https://regionofwaterloo.bidsandtenders.ca/

Award

Bridges / Tunnels

$2,646,816.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2022

April 1, 2022

Project location map

Multiple Locations, Linwood, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.