BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 16, 2022 at 8:00 PM

Updated October 24, 2023

Site work for a power facility in North Bonneville, Washington. Completed plans call for site work for a power facility.

As of April 29, 2022, this project has not yet been awarded. A timeline for award has not yet been established. The Project includes site expansion and rebuilding of Skamania PUD's existing North Bonneville substation as a small portion of the distribution scope required to take the substation offline. This expansion project consists of one (1) 115kV 1200A vertical break switch, one (1) 115kV 1200A candlestick circuit switcher, one (1) 115kV-12.47kV, Dyg, 15/20/25 MVA transformer, one (1) 1200A main 12.47 kV breaker, four (4) 12.47 kV distribution feeder reclosers, twelve (12) 333kVA 7.62kV voltage regulators, and a pre-fabricated control enclosure and all associated foundations. The existing BPA-owned 115KV dead-end structure and line switch will remain at the existing substation and modified as required for the expansion. The distribution portion of the project includes installation of three voltage regulators, a temporary feed to the BPA substation, and underground conduits for distribution feeders. All bid proposals shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check, or surety bond in an amount equal to five percent (5%) of the amount of such proposal. Should the successful bidder fail to enter into such contract and furnish a satisfactory performance bond within the time stated in the specifications, the bid proposal deposit shall be forfeited to the PUD. All questions and comments regarding this project may be addressed to Michael Durbin, Burns & McDonell in writing to mpdurbin@burnsmcd.com. The PUD reserves the right to waive minor informalities or irregularities in the bidding, accept the lowest responsible bid, reject any or all bids, or republish the call for bids. Interested contractors are strongly urged to attend the site walk. If deemed appropriate by the Engineer, questions that cannot be addressed by direct reference to the bidding documents will be the subject of an addendum issued to all plan holders.

Bid Results

Power Plant

$1,374,000.00

Public - County

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
49
Bidding Soon
1,032
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2022

May 9, 2022

Project location map

Multiple Locations, North Bonneville, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.