Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2022 at 8:00 PM

Updated October 24, 2023

Site work for a transportation facility in Seattle, Washington. Completed plans call for site work for a transportation facility.

The Work of this Contract includes, but is not limited to, construction of new HVAC system for the Central Operations and Maintenance Facility Link Command Center (OMFC LCC). This work includes new roof mounted HVAC system along with electrical upgrades, electrical equipment, electrical connections and upgrades for fire suppression system along with structural modifications for mounting of the HVAC system. Question Deadline 02/17/2022 05:00:00 PM ENGINEER’S ESTIMATE: $2,000,000.00 - 2,500,000.00

Bid Results

Transportation Terminals

$2,519,258.00

Public - State/Provincial

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
260
Active Projects
113
Bidding Soon
2,100
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 16, 2022

April 15, 2022

Project location map

3407 Airport Way S, Seattle, WA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed