Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 18, 2022 at 8:00 PM

Updated October 24, 2023

Site work for a laboratory facility in Seattle, Washington. Completed plans call for site work for a laboratory facility.

As of May 18, 2022, project was awarded to Redside Construction but awarded amount is not available. The UW Facilities department ("UWF"), is seeking proposals for a Float System and Steel Access Bridge for the Applied Physics Lab Floating Dock Restoration project.

Award

Laboratories

$400,000.00

Public - State/Provincial

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
272
Active Projects
119
Bidding Soon
2,120
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2022

July 15, 2022

Project location map

1013 NE 40th St, Seattle, WA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed