BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Carson City, Nevada. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; and sidewalk / parking lot.

A Notice to Proceed was issued May 6, 2022 and construction officially started in late May 2022. As of June 23, 2023, the project has reached substantial completion, but due to several extensions the project will officially be complete on August 31, 2023. Project Number : GWSE T.17.120 The project shall include, but not limited to: Remove existing facilities, install picnic areas, install electric vehicle charging infrastructure, perform parking and circulation improvements, and install interpretive trails and improvements Spooner Frontcountry Improvements Phase 2 Circulation & Facilities Improvements, Spooner Lake State Park, Douglas County, Nevada. Other associated or incidental work as shown or specified in the Contract Drawings and specifications. Prospective bidders shall at the time of bid opening, possess a valid Class "A" or "AB" contractors license issued by the Nevada State Contractors Board, registered and in good standings with the Nevada Secretary of State, and provide verifiable documentation and references of at least three similar projects completed successfully. All work must be completed within; ONE HUNDRED NINETY FIVE (195) calendar days after the date of commencement as stated in the Notice to Proceed. Each proposal shall be accompanied by a certified or cashier's check or bid bond in the amount of not less than 5 percent of the total bid price payable to the Nevada Division of State Parks as a guarantee that the bidder, if his proposal is accepted, will promptly execute the contract, secure the necessary insurance, furnish a performance bond in the amount of 100 percent of the total bid price, and furnish a labor and material bond in the amount of 100 percent of the bid price. As required by Nevada Revised Statutes, Chapter 338 and the United States Government, bidders are hereby notified that no less than the general prevailing wage rates, including rates for overtime and holiday work, in the locality in which the work is to be performed, for each craft or type of workman needed to execute the work contemplated under the Contract as determined by the Labor Commissioner of the State of Nevada and the U.S. Department of Labor, shall be paid to all workmen employed on said work by the Contractor or by a subcontractor performing any part of said work. A listing of the minimum wage rates in effect is included in the General Conditions of the Specifications. All questions relative to this project prior to the opening of bids shall be directed to: Kevin Sellstrom, Project Manager Nevada Division of State Parks 901 South Stewart Street, Ste. 5005 Carson City, Nevada 89701 Telephone: (775) 684-2790 Email: ksellstrom@parks.nv.gov Any questions must be received in writing on or before 2:00 PM on March 31st. Addendums will be issued on Mondays, March 21, March 28, and April 4. The Nevada Division of State Parks reserves the right to reject any and all bids, to waive any informality in a bid and to make awards in the interest of the State of Nevada.

Under Construction

Playgrounds / Parks / Athletic Fields

$4,472,818.00

Public - State/Provincial

Paving, Site Work

125

37

34

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
13
Bidding Soon
245
All Active Projects
104
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2022

May 23, 2022

img_map_placeholder

NV-28, Carson City, NV

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.