EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of a mixed-use development in Spearfish, South Dakota. Completed plans call for the renovation of a municipal facility; and retail development.

Eng Project # 22-008 Replace existing gutters and install Snow Guards on the following buildings: Gift Shop, Museum Building, (4) Stall Garage, HQ/Archive Building, WPA Residence, Booth House, and Booth House Porch. 1. 100% Small Business Set-aside, NAICS Code 238990 - All Other Specialty Trade Contractors, Size Standard $16.5M. This solicitation is a request for proposal under FAR Part 13 Simplified Acquisition Procedures and awarded as a firm-fixed price construction contract. All reference to discussions shall not be interpreted under FAR Part 15, but rather indicates that the Government may communicate with offers as allowed under Simplified Acquisition Procedures. 2. IAW FAR 36.204 the magnitude of this construction project is anticipated to be between $25,000 and $100,000. 3. Contractors shall follow instruction in section L of the solicitation. 4. Any request for information or request for a site visit must be received no later than 18 February 2022 via e-mail at miguel_martinez@fws.gov by 12:00 PM MST. 5. Proposals must be received via e-mail to Miguel Martinez at miguel_martinez@fws.gov no later than 28 February 2022 by 5:00 PM MST Period of Performance: 03/31/2022 to 03/31/2023 Replace existing gutters and install Snow Guards on the Gift Shop Building. The contractor shall furnish all labor, expertise, supervision, labor, materials, supplies, and equipment necessary to complete the work as defined by the approved construction specifications, statement of work, and drawings. All material shall be approved and conform with specifications. Period of Performance: 365 Days after notice to proceed. Firm Fixed Price Contract. Delivery: 03/31/2023 The Contractor shall be required to (a) commence work under this contract within [10] ten calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than three hundred and sixty-five [365] days. The time stated for completion shall include final cleanup of the premises. REQUESTS FOR INFORMATION (RFI). a. Offerors shall electronically submit RFIs directly to the Contract Specialist, Miguel Martinez (miguel_martinez@fws.gov) with solicitation number in subject line. At a minimum, RFIs shall include the following A responsive proposal shall consist of the following at minimum: SF 1442 with completed blocks 14 (include CAGE Code and DUNS Number), 15, 17, 19 20A, 20B, and 20C; and acknowledge all amendments. Section B filled out - Supplies or Services & Prices or Costs. Technical Proposal to include all Federal, State, and Local licenses, and/or certification, etc., necessary to perform work in at the station. All licenses and/or certificates must be current from start to finish of the project. Past Performance (Provide at minimum three (3) comparable projects completed during the past five years and provide references.

Post-Bid

Municipal

$100,000.00

Public - Federal

Renovation

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Special Procedures, Alteration Project Procedures, Temporary Facilities and Controls, Temporary Utilities, Vehicular Access and Parking, Temporary Roads, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Commissioning
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites
Division 26 - Electrical

Division 26 - Electrical

Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
8
Bidding Soon
72
All Active Projects
43
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2022

April 15, 2022

img_map_placeholder

Multiple Locations, Spearfish, SD

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Replace Existing Gutters and Install Snow Guards

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.