BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Spearfish, South Dakota. Completed plans call for site work for a road / highway.

SCOPE OF CONTRACT The Contractor shall furnish all labor, equipment, materials, and incidentals necessary to: A) fully develop and expand quarries to the permitted limits, and B) produce and stockpile crushed gravel in the locations, quantities, quality, and gradations specified. Items considered incidental to the pay items listed in the Schedule of Items include but are not limited to the following: pit development, clearing and grubbing, topsoil removal, removal of debris and logging slash at filler material locations, and mobilization. The work shall be performed in two existing quarries located on Forest Service land. Crushing activities shall be coordinated with the Forest Service and other users of the pit area. The Contractor shall maintain access roads to the pit and filler source locations. The Contractor is responsible for loading, transporting, and blending of filler material if needed. The Contractor is responsible for reclaiming/re-sloping all ground surface disturbed by their operations. PROJECT LOCATON Limestone B Pit is located in Section 3, T4N, R1E, Lawrence County SD. Custer Peak Pit is located in Section 1, T3N, R3E Lawrence County SD. Stockpiles shall be located as directed by the Contracting Officers Representative (COR). The area to be utilized for the execution of this contract will be flagged or staked by the Forest Service. Operations shall be conducted within this area unless written authorization is received from the COR to extend the boundaries. Field locations for crusher, stockpiles, disposal pits, and clearing limits shall be approved by the COR prior to the start of operations. MAGNITUDE OF CONSTRUCTION PROJECT The estimated price range of the project is between $100,000 and $250,000 AT A MINIMUM, OFFEROR SHALL SUBMIT THE FOLLOWING DOCUMENTS BACK WITH THEIR RESPONSE TO THIS SOLICITATION: 1. SF-1442, Complete, date, and sign. Provide UNIQUE SAM IDENTIFER and email address. Block 14 2. Representations and Certifications Section K 52.204-8. You must complete Representations and Certifications via SAM, please only submit a response to Paragraph (b)(1) Pg. 25. 3. Provide information required Section L.2 Quote Preparation Instruction 32-33 4. Fill out the pricing schedule for all items Section B-Schedule, Page 6 7. Submit Bid Guarantee 52.228-1-20% of your price PROPOSALS ARE DUE June 2, 2022 BY 1630 MT Return to: NAME: TANYA SPANFELLNER Email:tanya.spanfellner@usda.gov Solicitation No. 1240LT22Q0087 ONLY EMAIL PROPOSALS ARE BEING ACCPETED Please keep a copy of your quote for your records. NO PAPER SOLICITATIONS SHALL BE ISSUED. IT IS THE OFFERORS RESPONSIBILITY TO WATCH FOR ANY AND ALL AMENDMENTS TO THE SOLICITATION Commencement, Prosecution, and Completion of Work (APR 1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than Base-Limestone B Pit September 26, 2022 Option Item-Custer Peak Pit September 26,2022-November 17, 2022. The time stated for completion shall include final cleanup of the premises.

Post-Bid

Roads / Highways

$250,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
7
Bidding Soon
63
All Active Projects
26
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2022

September 26, 2022

img_map_placeholder

2014 N Main St, Spearfish, SD

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.