Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Bedford Park, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.
The Village of Bedford Park, a Home Rule Unit of Government Cook County, Illinois will receive sealed proposals. The proposed work is officially known as: Village of Bedford Park Sayre Avenue Extension, 65th St. - 68th St. And is further described as following: All material, labor, equipment, and incidentals necessary for removal of existing surface, and subsequent construction of hot-mix asphalt surface, concrete pavement, concrete curb and gutter, storm sewer, and all other miscellaneous and incidental improvements including pavement marking and restoration. All work will be in conformance with the latest editions of the standard specifications for water and sewer main construction in illinois and the standard specifications for road and bridge construction of the state of illinois, and all revisions thereto. Only bidders with a current 1DOT pre-qualification certificate will be eligible to receive plans and specifications.. D. All proposals must be accompanied by a bank cashier's check, or bank draft. All laborers and mechanics employed by Contractor or Subcontractor on construction work for this project shall be paid wages at rates not less than those prevailing as determined by the Department of Labor of the State of Illinois as of June 5, 2001 and all revisions thereto. B. All contracts and subcontracts for construction or repair shall include a provision for compliance with the Copeland "Anti-Kickback Act" (18 U. S.C. 874) as supplemented in Department of Labor Regulations (29 CFR, Part 3) C. Contracts shall include a provision for compliance with Sections 103 and 107 of the Contract Work Hours and Srfety Standards Act (40 U.S.C. 327-330) as supplemented by Department of Labor Regulations (29 CFR, Part 5). D. Contracts shall include a provision for compliance with the Employment of Illinois Workers on Public Works Act codified in 30 ILCS 570-1 (West 1996). If at the time during the term of this contract is executed or if during the term of the contract, there is excessive unemployment in Illinois as defined in the Employment of Illinois Workers on Public Works Act 30 ILCS 570-0.01 et seq., as two consecutive months of excessive unemployment exceeding 5%, the Contractor agrees to employ Illinois laborers. An 'Illinois laborer" is defined as any person who has resided in Illinois for at least thirty (30) days and intends to become or remain an Illinois resident. The Act relies on and incorporates the Bureau of Labor Statistics and its monthly publications of employment and unemployment figures. These figures may be reviewed in the Bureau's site at The undersigned Bidder does hereby certify that it is not barred from bidding on the contract as a result of a violation of either Section 33 E-3 or 33 E-4 of Chapter 38 Illinois Revised Statutes PART VI. REJECTION OF BIDS The Village reserves the right to reject any or all bids and to waive formalities of the bidding process.
Post-Bid
Roads / Highways
$460,000.00
Public - City
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 24, 2022
March 28, 2022
S Sayre Ave, Bedford Park, IL
Related To This Project
Bedford Park, IL
Bid Date: Apr 08 2022
Bedford Park, IL
Bid Date: Oct 26 2023
Bedford Park, IL
Bid Date: Mar 08 2024
Bedford Park, IL
Bid Date: Jun 04 2024
Bedford Park, IL
Bid Date: Jul 30 2024
Bedford Park, IL
--
Bedford Park, IL
Bid Date: Aug 26 2024
Bedford Park, IL
Bid Date: Aug 26 2024
Bedford Park, IL
Bid Date: Jul 24 2023
Bedford Park, IL
Bid Date: Jul 28 2023
Bedford Park, IL
Bid Date: Jun 30 2023
Bedford Park, IL
Bid Date: May 16 2022
Bedford Park, IL
Bid Date: May 04 2022
Bedford Park, IL
Bid Date: May 19 2022
Bedford Park, IL
Bid Date: Nov 02 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.