Site work and renovation of a water / sewer project in Clarkstown, New York. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Please note is the designated locations and means for distributing and obtaining all bid package information. All bidders are urged to register to ensure receipt of all necessary information, including bid addenda. PLEASE TAKE FURTHER NOTICE that all bids and proposals must be accompanied by a statement of non- collusion in conformity with the requirements of Section 103-D of the General Municipal Law. The Town Board reserves the unrestricted right to accept or reject any and all bids or to waive informalities therein. All phases of this project are eligible for financing through the New York State Environmental Facilities Corporation (NYSEFC). Proposers should carefully review the "NY State Revolving Fund Bid Packet for Construction Contracts" which is included as part of the contract documents. Among other requirements, the successful Firm shall utilize Minority Business Enterprises (MBE) and/or Women's Business Enterprises (WBE) in the performance of the work according to the goals specified in the documents. The Town Council reserves the right to reject any or all bids, waive any informalities in and to accept such bids which, in its opinion, are in the best interests of the Town. No bidder may withdraw his bid within 60 (sixty) days after the actual date of the opening thereof. The Project consists of the replacement/rehabilitation of four sewage pump stations to remain in compliance with regulatory agencies and their standards. 1. Project Locations: a. Alpine Court, Congers, NY b. Barr More Hill, Valley Cottage, NY c. Jill Lane, New City, NY d. Mayfield Street, Valley Cottage, NY The Work shall be conducted in phases, with each phase substantially complete as indicated including but not limited to the following: 1. Alpine Court, Congers a. Mobilization phase: Prepare site and equipment to commence work. Work of this phase shall commence within 30 days after the Notice to Proceed. The installation of the bypass pumping system shall be accomplished before any demolition and construction work. b. Demolition phase including but not limited to: Remove and dispose of piping and mechanical equipment including pumps and valves as shown in the Contract Drawings. c. Construction phase including but not limited to: Construct new sewage pump station to replace the existing sewage pump station as shown in the Contract Drawings: 1) Clearing of the site to accomodate new work. 2) Construction and installation of reinforced concrete pad for fan. 3) Installation of new valve vault. 4) Isolation of existing wet well. 5) Installation of two submersible pumps and associated components. 6) Installation of portable generator switch and transfer switch. 7) Installation of electrical work. 8) Installation of HVAC work. 9) Installation of site piping. 10) Installation of new force main to connect to existing. 11) Install new RPZ service and yard hydrant. 12) Installation of access stairs. 13) Site restoration. 2. Barr More Hill, Valley Cottage a. Mobilization phase: Prepare site and equipment to commence work. Work of this phase shall commence within 30 days after the Notice to Proceed. The installation of the bypass pumping system shall be accomplished before any demolition and construction work. b. Demolition phase including but not limited to: Remove and dispose of piping and mechanical equipment including pumps and control panel as shown in the Contract Drawings. c. Construction phase including but not limited to: Construct new sewage pump station to replace the existing sewage pump station as shown in the Contract Drawings: 1) Clearing of the site to accomodate new work. 2) Upgrade of electrical service. 3) Installation of new door and upgrades to existing roof. 4) Construction and installation of reinforced concrete pad for fan 5) Isolation of existing wet well. 6) Installation of two submersible pumps and associated components. 7) Installation of comminutor and associated components. 8) Installation of emergency generator and transfer switch. 9) Installation of electrical work. 10) Installation of HVAC work. 11) Installation of new force main to connect to existing. 12) Install new RPZ service and yard hydrant. 13) New paving and g 3. Jill Lane, New City a. Mobilization phase: Prepare site and equipment to commence work. Work of this phase shall commence within 30 days after the Notice to Proceed. The installation of the bypass pumping system shall be accomplished before any demolition and construction work. b. Demolition phase including but not limited to: Remove and dispose of piping and mechanical equipment including pumps and control panel as shown in the Contract Drawings. c. Construction phase including but not limited to: Construct new sewage pump station to replace the existing sewage pump station as shown in the Contract Drawings: 1) Clearing of the site to accomodate new work. 2) Construction and installation of reinforced concrete pad for fan. 3) Installation of a precast concrete control building. 4) Isolation of existing wet well. 5) Installation of two submersible pumps and associated components. 6) Installation of portable emergency generator switch and transfer switch. 7) Installation of electrical work. 8) Installation of HVAC work. 9) Installation of new force main to connect to existing. 10) New paving. 11) Site restoration. 4. Mayfield Street, Valley Cottage a. Mobilization phase: Prepare site and equipment to commence work. Work of this phase shall commence within 30 days after the Notice to Proceed. The installation of the bypass pumping system shall be accomplished before any demolition and construction work. b. Demolition phase including but not limited to: Remove and dispose of piping and mechanical equipment including pumps and control panel as shown in the Contract Drawings. c. Construction phase including but not limited to: Construct new sewage pump station to replace the existing sewage pump station as shown in the Contract Drawings: 1) Clearing of the site to accomodate new work. 2) Construction and installation of reinforced concrete pad for fan. 3) Isolation of existing wet well. 4) Installation of two submersible pumps and associated components. 5) Installation of portable emergency generator switch and transfer switch. 6) Installation of electrical work. 7) Installation of HVAC work. 8) Installation of new force main to connect to existing. 9) New paving. 10) Site restoration.

Award

Water / Sewer

$2,139,000.00

Public - City

Renovation, Site Work

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
469
Active Projects
252
Bidding Soon
4,498
All Active Projects
2,052
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2022

April 8, 2022

img_map_placeholder

Multiple Locations, Clarkstown, NY


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.