BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 15, 2022 at 8:00 PM

Updated September 15, 2023

Site work and paving for a mixed-use development in Independence, Missouri. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This project will convert the intersection of Winner, Northern and 18th Street in the Englewood Arts District into a roundabout. The project willremove the existing signal and make bike/ped improvements at the intersection, connecting into the improvements made in Phases 1 through 3 of the Englewood program. This project continues the ongoing multi-phase investments in the Englewood Arts District. The project will improve traffic safety along thecorridor; the elimination of the signal will improve the sustainability of costs associated with traffic operations. This project is included in the city's 2021-2027 Capital Improvement Plan (CIP). As of February 11, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$975,100.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
65
Bidding Soon
1,083
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

Project location map

E Winner Rd & S Northern Blvd, Independence, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.