Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 7, 2022 at 7:00 PM
Updated November 15, 2023
Site work and paving for a mixed-use development in Dodge Center, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Removal of bituminous pavement and replacing with 8" of concrete pavement for approximately 4100'. Approximately 1000' of bituminous shoulder paving. Minor side street bituminous paving. ADA improvements along the corridor with additional 6' sidewalk construction. Site Directions: Along County Road 7, approximately 900' North of Highway 14 and continuing approximately 4100' North through the City of Center. The project consists of: 19043 SY Concrete Pavement 8.0 Inches 6134 SF 5" Concrete Walk 1469 SF 6" Concrete Walk 290 SF Truncated Domes 889 TON Bituminous 8 EACH Hydrant 188 LF 6" PVC Watermain
Post-Bid
Roads / Highways
$260,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
