BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a transportation facility in San Diego, California. Completed plans call for site work for a transportation facility.

The magnitude of this work is in the range of $1,471,000.00. The bidder must possess a valid California State Contractors License, classification B and C10 at the time the contract is submitted. The Work includes the furnishing of labor, materials, equipment, and incidental items meeting the technical requirements of the Contract documents to upgrade the existing lighting regulators and to provide a fire suppression system for the Airfield Lighting Vault, to include the following scope of work: 1. Provide a gaseous fire suppression system. This will include gas tanks and piping, fire detection system to release gas and mechanical dampers to seal off openings (air vents, exhaust fans and air conditioners) in the vault. 2. Change the existing lighting out to LED type. One for one replacement, no other work. 3. Replace Constant Current Regulators. These will be done one at a time with as many as possible without disrupting airport operations. Old regulators will be taken out of service and replaced with new ones. New regulators will be put back on the old analog control system until all are replaced. Some will require new high voltage cutouts and wiring to high voltage splice panel. 4. Install a new lighting control system rack in vault and new remote-control computer in tower. All new regulators are digital and will be also connected to new rack. After all regulators are replaced, the new control system will be put in service. Deadline to Submit Written Questions. All questions shall be submitted via e-mail to Missy McGrath at _mmcgrath@san.org. Questions will be received until, 2:00 pm on March 1, 2022. Any questions received after that time and date will not be considered. In accordance with the provisions of the California State Labor Code, the Airport Authority has obtained the general prevailing rate of wages (which rate includes employer payments for health and welfare, vacation, pension and similar purposes) applicable to the work to be done, for straight time, overtime, Saturday, Sunday and holiday work. All labor employed on this project shall be paid no less than such minimum rates of wages. It is the practice of the Airport Authority that certified Disadvantaged Business Enterprises (DBEs) shall have the maximum opportunity to participate in the performance of Airport Authority contracts. Certified DBEs with qualifying experience are encouraged to respond to the request for proposals/bids/quotes, etc. Scope of Work: 1. Replace Airfield Lighting Regulators within the Vault 2. Install Gaseous Fire Suppression System and Upgrade HVAC System within the Vault 3. Replace Lighting Fixtures within the Vault 4. Replace computerized lighting controls and upgrade remote monitoring station at ATCT

Award

Transportation Terminals

$1,399,399.00

Public - County

Site Work

90

33

7

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
27
Bidding Soon
726
All Active Projects
331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.