EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2022 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Morrison, Illinois. Completed plans call for site work for a water / sewer project.

Furnish and install 965 customer water meters, 1637 meter transmitters, a data collector base station, a radio meter reading system and software. A certified check or bank draft on a responsible solvent bank, or a satisfactory bid bond executed by the bidder on an acceptable surety company, payable to City of Morrison, in an amount not less than five percent (5%) of the total bid shall be submitted with each bid. The successful bidder will be required to furnish satisfactory performance and payment bonds each for 100% of the awarded contract price. No bid shall be withdrawn after the opening of bids without the consent of City of Morrison for a period of one hundred twenty (120) days after the scheduled time of receiving bids. Any contract or contracts awarded under this invitation for bids are expected to be funded in part by a loan from the Illinois Environmental Protection Agency (Illinois EPA). Neither the State of Illinois nor any of its departments, agencies, or employees is or will be a party to this invitation to bids or any resulting contract. The procurement will be subject to regulations contained in the Procedures for Issuing Loans from the Public Water Supply Loan Program (35IAC Part 662), the Davis-Bacon Act (40 USC 276a through 276a-5), as defined by the United States Department of Labor, the Employment of Illinois Workers on Public Works Act (30 ILCS 570), the Illinois Works Jobs Act (30 ILCS 559/Art. 20), and the "Use of American Iron and Steel" requirements as contained in Section 436 of H.R. 3547, The Consolidated Appropriation Act, 2014. This procurement is also subject to the loan recipient's policy regarding the increased use of disadvantaged business enterprises. The loan recipient's policy requires all bidders to undertake specified affirmative efforts at least sixteen (16) days prior to bid opening. The policy is contained in the specifications. Bidders are also required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in 41 CFR 60-4. Attention is called to the fact that not less than the minimum salaries and wages as set forth in the construction documents must be paid on this project and that the contractor must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex or national origin. The City of Morrison is an equal opportunity employer. The City of Morrison does not discriminate on the basis of handicapped status in the admission or access to, or treatment or employment in, its programs or activities. The City of Morrison, Illinois reserves the right to reject any non-responsive bid and/or non-responsible bid. Bids may be held by the City of Morrison, Illinois for a period not to exceed one hundred twenty (120) days from the date of the opening of bids for the purpose of reviewing the bids and investigating the qualifications of bidders, prior to awarding the Contract. All work under Contract No. 1 shall be substantially complete within 180 calendar days and final completion shall be within 240 calendar days from the execution of the Notice to Proceed.

Bid Results

Water / Sewer

$754,328.00

Public - City

Site Work

4

8

3

7

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Substitution Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Field Offices and Sheds, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Warranties, Project Record Documents, Spare Parts
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Plastic Fabrications
Division 09 - Finishes

Division 09 - Finishes

Flooring, Carpeting
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Trenching, Dewatering
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Unit Paving, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Manufacturing Equipment, Machining Equipment, Drilling Equipment, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
49
Bidding Soon
641
All Active Projects
282
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2022

April 28, 2022

img_map_placeholder

Multiple Locations, Morrison, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Water System Improvements - Contract No. 1

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.