EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 11, 2022 at 8:00 PM

Updated October 1, 2024

Renovation of a multi-residential development in Charleroi, Pennsylvania. Completed plans call for the renovation of a multi-residential development.

As of September 01st, 2022, project has not been awarded yet. No timeline of award was established Each bid shall be accompanied by a bid guaranty, which shall not be less than ten percent (10%) of the total amount of the bid. The form of the guaranty shall be in accordance with the type permitted under the contract documents. SBE, MBE, WBE and Section 3 businesses are encouraged to bid Standard contract provisions of the U.S. Department of HUD Act of 1968, as amended, and the U.S. Department of Labor for CDBG apply to this project, including Federal Prevailing Wage Rates, Civil Rights, EO 11246, EO 11625, Affirmative Action, Section 3 Requirements, Federal Public Works, Section 504 of the Rehabilitation Act of 1973, together with all Standard Provisions of CDBG Programs. Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, age, color, religion, sex, national origin, or handicap. The purpose of Section 3 is to ensure that employment and other economic opportunities generated by HUD assistance or HUD-assisted projects covered by Section 3, shall, to the greatest extent feasible, be directed to low and very low-income persons, particularly persons who are recipients of HUD assistance for housing. The Redevelopment Authority of the County of Washington reserves the right to reject any or all bids or to waive any informalities in the bidding. Bids may be held by the Redevelopment Authority of the County of Washington for a period not to exceed forty-five (45) days from the date of opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of Bidders, prior to awarding of the contract. In no event will the Redevelopment Authority of the County of Washington consider a Contractor as eligible if he cannot initiate the work under the contract within 14 days of the contract execution and proceed to the successful completion of the work within 180 consecutive calendar days of the Notice to Proceed. COMPLETION TIME: 180 Calendar Days

Award

Multi-Residential

$659,000.00

Public - County

Renovation

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Quantity Allowances, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems
Division 08 - Openings

Division 08 - Openings

Windows, Aluminum Windows, Wood Windows, Composite Windows, Hardware
Division 09 - Finishes

Division 09 - Finishes

Flooring, Resilient Flooring
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Lifts

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
118
Bidding Soon
906
All Active Projects
437
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2022

September 12, 2022

img_map_placeholder

500 Crest Ave, Charleroi, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Crest Avenue Apartments Window Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.