Published February 15, 2022 at 7:00 PM
Updated November 15, 2023
Site work and new construction of a power facility in Richland, Washington. Conceptual plans call for the construction of a power facility; and for site work for a power facility.
This project constructs a new electrical substation on the west side of Dallas Road. The City purchased approximately 2 acres of land specifically for the substation adjacent to I-82 and constructed the 115kV transmission line interconnecting to BPA's system. The Dallas Road Substation will initially consist of one City power transformer, switchgear, and control house structure similar to existing City substations. The substation will provide the capacity to serve the Badger Mountain South area as it continues to grow, as well as interconnection to existing distribution circuits for increased reliability. There is additional substation space for a second transformer and associated equipment if needed to supply future electrical demand. The Dallas Road Substation and associated transmission line is a partnership project with BPA and Benton PUD. The substation has space if Benton PUD needs to co-locate equipment similar to Leslie Road Substation. Additionally, the City's transmission line is planned to be interconnected with BPA at Reata Sub and Benton PUD is planning to extend a transmission line to Sunset Substation. Once interconnected, it will provide a significant regional benefit and capacity with a major transmission route from BPA's Red Mountain to BPA's Badger Canyon substations. This project is in included in the City of Richland FY 2022-2027 Capital Improvement Plan (CIP). As of February 12, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Power Plant
$8,470,000.00
Public - City
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 1, 2023
Dallas Rd, Richland, WA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.