Published February 15, 2022 at 7:00 PM

Updated November 15, 2023

Site work and new construction of a power facility in Richland, Washington. Conceptual plans call for the construction of a power facility; and for site work for a power facility.

This project constructs a new electrical substation on the west side of Dallas Road. The City purchased approximately 2 acres of land specifically for the substation adjacent to I-82 and constructed the 115kV transmission line interconnecting to BPA's system. The Dallas Road Substation will initially consist of one City power transformer, switchgear, and control house structure similar to existing City substations. The substation will provide the capacity to serve the Badger Mountain South area as it continues to grow, as well as interconnection to existing distribution circuits for increased reliability. There is additional substation space for a second transformer and associated equipment if needed to supply future electrical demand. The Dallas Road Substation and associated transmission line is a partnership project with BPA and Benton PUD. The substation has space if Benton PUD needs to co-locate equipment similar to Leslie Road Substation. Additionally, the City's transmission line is planned to be interconnected with BPA at Reata Sub and Benton PUD is planning to extend a transmission line to Sunset Substation. Once interconnected, it will provide a significant regional benefit and capacity with a major transmission route from BPA's Red Mountain to BPA's Badger Canyon substations. This project is in included in the City of Richland FY 2022-2027 Capital Improvement Plan (CIP). As of February 12, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Power Plant

$8,470,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
1
Bidding Soon
166
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 1, 2023

Project location map

Dallas Rd, Richland, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.