Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 1, 2022 at 7:00 PM
Updated October 1, 2024
Site work and paving for a mixed-use development in Barrington, Illinois. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; road / highway; and road / highway.
PREQUALIFICATION OF BIDDERS: All bidders will submit along with their respective bid documents, a resume of similar projects performed, enumerated as to location, type of work, approximate completion date, and project engineering firm. Additionally, all bidders will submit a list of equipment owned by, or available to them, for the efficient pursuance of the project. 4. PROGRESS SCHEDULE: All bidders will submit along with their respective bid documents, a satisfactory progress schedule or critical path schedule which shall show the proposed sequence of work, and how the Contractor proposes to complete the various items of work on or before the completion date specified. Contractor shall work around the individual summer school schedules provided on the plans and listed in the special provisions. Failure to provide a satisfactory progress schedule in the bid package will, at the discretion of the District, be disqualified. 5. WAGES OF EMPLOYEES: Certified payroll documentation of general contractor's and all sub-contractors' laborers will be required. 6. REJECTION OF BIDS: The Owner reserves the right to reject any and all bids and bidders and to waive technicalities. 7. LOCATION OF THE WORK: Barrington High School under School District 220 authority within the Village of Barrington found in Lake County. 8. DESCRIPTION OF WORK: Project will include but not limited to: HMA pavement patching, concrete work, site grading and restoration, baseball field improvements, fence improvements and other items needed to complete the proposed improvements. This project is to be bid as a lump sum contract with supplemental unit prices. CONSTRUCTION SCHEDULE: Substantial Completion is defined as all improvements except restoration. Final completion is defined as restoration and punch list items. In case of failure to complete the work on time, liquidated damages shall be assessed in accordance with Article 108.09 of the Standard Specifications or other applicable BDE Special Provisions shall apply.
Bid Results
Playgrounds / Parks / Athletic Fields
$232,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 03 - Concrete
Division 05 - Metals
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 14 - Conveying Equipment
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 28, 2022
June 7, 2022

616 W Main St, Barrington, IL
Related To This Project
Barrington, IL
Bid Date: Feb 25 2022
Barrington, IL
Bid Date: Mar 11 2022
Barrington, IL
Bid Date: Sep 27 2023
Barrington, IL
Bid Date: Sep 13 2022
Barrington, IL
Bid Date: Oct 07 2021
Barrington, IL
Bid Date: Nov 08 2023
Barrington, IL
Bid Date: Nov 08 2023
Barrington, IL
Bid Date: Feb 22 2022
Barrington, IL
Bid Date: Feb 22 2022
Barrington, IL
--
Barrington, IL
Bid Date: Dec 03 2021
Barrington, IL
--
Barrington, IL
Bid Date: Sep 22 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Cut Costs, Not Corners.
Get ahead of project risks by targeting the right work early. With detailed construction data at your fingertips, you can pursue jobs that match your margins—and walk away from those that don’t.
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.