BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and addition to an educational facility in Sioux Falls, South Dakota. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.

a. The work includes the addition of a gymnasium, locker rooms and storage room b. Remodeling work includes revisions to the existing gymnasium as a student commons, restrooms and kitchen serving area. c. Remodeling work includes a new music room and new kindergarten rooms. d. Remodeling work includes removing operable partitions and replacing with steel stud partitions at existing classrooms. e. Remodeling work includes replacing suspended acoustical ceilings and grid and providing new light fixtures. f. Site work includes new parent drop off lane, new parking lot and revisions to existing site drainage channel. The method of contractor selection has not been determined at this time. Phase 1 work shall commence on site on April 4, 2022 COMPLETION OF CONTRACT: August 15, 2023 Phase 1: Phase 1 work shall commence on site on April 4, 2022, and shall be substantially completed and ready for occupancy by December 16, 2022. Final completion of all punch list items shall be no later than December 30, 2022. a. Construction of new gymnasium #236, locker rooms #237, #238 and storage room #241. b. Construct new mechanical room #100B for gymnasium. Phase 2: Phase 2 work shall commence on site on June 1, 2022 and shall be substantially completed and ready for occupancy by August 12, 2022. Final completion of all punch list items shall be completed no later than August 26, 2022. See site drawing sheet 2.30. a. Construction of new parent drop off lane and new parking lot. b. Construction of new underground storm sewer utilities and drainage upgrades. c. Construction of concrete sidewalks on south and southeast side of the building. d. Construct new concrete paving to east front door or provide temporary paving to east door during the school year. e. Landscaping items and final planting shall be completed by October, 2022. Phase 3: Phase 3 work shall commence on site as soon as phase 1 work is completed or approximately January 3, 2023 and shall be substantially completed ready for occupancy by April 28, 2023. Final completion of all punch list items shall be no later than May 12, 2023. a. Remodel existing gymnasium into new Multipurpose Room #230. b. Remodel existing spaces into restrooms 230C and 230F. c. Remodel existing spaces into food service #233. d. Remodel old stage into table storage 230A and storage 230B Phase 4: Phase 4 work shall commence on site during the summer, 2023. and shall be substantially completed ready for occupancy by August 11, 2023. Final completion of all punch list items shall be no later than August 15, 2023. a. Remodel existing spaces into kindergarten rooms #210 and #218. b. Remodel existing spaces into Music room #219. c. Remodel existing Band room #228. d. Remodel existing spaces into Exterior storage #232 and custodian office #224. e. Remodel corridors #209, #217 and #220. f. New vestibule #100A. g. Remodel work in the existing classrooms including removing existing operable partitions, installing new steel stud partitions, new marker and tack boards, new ceilings and new lighting. Work can be completed in the summer, 2022 and/or summer, 2023. h. Remodel work including new ceiling tile and new light fixtures in existing rooms included in Add Alternate #1 if accepted, shall be completed in the summer 2022 and/or summer, 2023. Project Location: John F. Kennedy Elementary School, 4501 S. Holbrook Avenue, Sioux Falls, South Dakota 57106 Sol.no- A1211400

Award

Educational

$6,094,000.00

Public - City

Addition, Demolition, Site Work

98

31

13

6

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
16
Bidding Soon
232
All Active Projects
119
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 8, 2022

April 4, 2022

img_map_placeholder

4501 S Holbrook Ave, Sioux Falls, SD

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.