BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Sioux Falls, South Dakota. Completed plans call for site work for a transportation facility; for paving for a transportation facility; and water / sewer project.

The proposed work includes the following: Realign Taxiway D, Reconstruct Taxiway F, and Remove Taxiway E Project work items include, but are not limited to asphalt removals, grading, edge drain, geotextile fabric, subbase, crushed aggregate base, asphalt paving, pavement marking removal, pavement marking, seeding & mulching, airside traffic control and airfield electrical. Each bid in excess of $50,000.00 shall be accompanied by either a certified check, cashiers check or draft in a sum equal to five percent (5%) of the maximum bid price and drawn on a State or National Bank or a bid bond in a sum equal to ten percent (10%) of the maximum bid price executed by the Bidder as principal and by a surety company authorized to do business in the State of South Dakota, payable to the Sioux Falls Regional Airport Authority, conditioned that if the principal's bid be accepted and the contract awarded to him, he, within ten (10) days after Notice of Award has been executed, will execute and effect a contract in accordance with the terms of his bid and a contractor's bond as required by law and regulations and determinations of the governing board. The bid security of the two lowest bidders will be retained until the Notice of Award has been executed, but no longer than thirty (30) days. The bid security is a guarantee that the bidder will enter into contract for work described in the Proposal. The successful Bidder will be required to furnish a Contract Performance Bond, a Payment Bond in the full amount of the Contract, and proof of Contractor's Excise Tax License. The Sioux Falls Regional Airport Authority reserves the right to hold all bids for a period of thirty (30) days after the date fixed for the opening thereof to reject any and all bids and waive defects and to accept any bids should it be deemed for the public good and also reserves the right to reject the bid of any party who has been delinquent or unfaithful in the performance of any former contract to the Owner. The goals and timetables for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows: Timetables Goals for minority participation for each trade: 1.2% Goals for female participation in each trade: 6.9% These goals are applicable to all of the Contractors construction work (whether or not it is Federal or federally assisted) performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, it shall apply the goals established for such geographical area where the work is actually performed. With regard to this second area, the Contractor also is subject to the goals for both its federally involved and non-federally involved construction. The Contractor's compliance with the Executive Order and the regulations in 41 CFR Part 60-4 shall be based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the specifications set forth in 41 CFR 60-4.3(a) and its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade, and the Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, the Executive Order and the regulations in 41 CFR Part 60-4. Compliance with the goals will be measured against the total work hours performed. 3. The Contractor shall provide written notification to the Director of the Office of Federal Contract Compliance Programs (OFCCP) within 10 working days of award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the name, address, and telephone number of the subcontractor; employer identification number of the subcontractor; estimated dollar amount of the subcontract; estimated starting and completion dates of the subcontract; and the geographical area in which the subcontract is to be performed. As used in this notice and in the contract resulting from this solicitation, the "covered area" South Dakota, Minnehaha County, Sioux Falls. The Sioux Falls Regional Airport Authority, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders or offerors that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The requirements of 49 CFR part 26 apply to this contract. It is the policy of the Sioux Falls Regional Airport Authority to practice nondiscrimination based on race, color, sex, or national origin in the award or performance of this contract. The Owner encourages participation by all firms qualifying under this solicitation regardless of business size or ownership. The Owner's award of this contract is conditioned upon Bidder or Offeror satisfying the good faith effort requirements of 49 CFR 26.53. The successful Bidder or Offeror must provide written confirmation of participation from each of the DBE firms the Bidder or Offeror lists in its commitment within five days after bid opening. 1. The names and addresses of Disadvantaged Business Enterprise (DBE) firms that will participate in the contract; 2. A description of the work that each DBE firm will perform; 3. The dollar amount of the participation of each DBE firm listed under item 1; 4. Written statement from Bidder or Offeror that attests their commitment to use the DBE firm(s) listed under item 1 to meet the Owner's project goal; and 5. If Bidder or Offeror cannot meet the advertised project DBE goal, evidence of good faith efforts undertaken by the Bidder or Offeror as described in appendix A to 49 CFR Part 26.

Bid Results

Transportation Terminals

$1,878,787.00

Public - City

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
16
Bidding Soon
221
All Active Projects
111
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2022

July 11, 2022

img_map_placeholder

2801 N Jaycee Ln, Sioux Falls, SD

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.