BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 25, 2022 at 7:00 PM

Updated November 15, 2023

Demolition, site work, renovation and addition to an educational facility in Liberty Hill, Texas. Completed plans call for the demolition of a educational facility; for site work for a educational facility; and for the addition of a 13,500-square-foot, two-story above grade educational facility.

Steel fabrication was bid previously in bid package 2, and includes steel decking and structural steel. The material is scheduled to be delivered in the summer of 2022, per the project schedule. Steel subs need to include steel erection and miscellaneous site steel. Plans and specification documents are called out to be "Draft copy - Not for approval or construction." However, the issued plans and specification set are the 95% construction documents and will be considered as the GMP documents for the Santa Rita MS Expansion. Requests for bid on the construction of a new two-story 13,500 sf middle school expansion for Liberty Hill ISD. The new building will be structural steel framed with ICF and metal stud wall systems. This project also includes site improvements such as paving, parking, and landscaping. Alternates: 1. Provide 1000sf Outdoor learning space southwest of new addition. 2. Connect existing Middle School sewer line with Gravity sewer line. 3. Replace thirteen (13) wall packs on the north and westside of the existing school with new LED colored light fixtures. Reference MEP drawings. 4. Add rubber flooring to band hall, ensemble rooms and practice rooms. Refer to plans. 5. New closet to be added to current SRO office. 6. Add new exterior single man door at current boys locker room facing field. 7. Provide exterior wall graphic to east wall of existing school. Refer to plans. 8. Provide new pressbox. 9. Provide new field bleachers. To be considered for a contract, each proposer must submit and/or update the subcontractor qualification form accessible at www.bartlettcocke.com. Please do not submit this with your proposal. Addendum #1 has been released 02/24/22. There are no changes to the bid date.

Post-Bid

Educational

$4,000,000.00

Public - City

Addition, Demolition, Renovation, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
1
Bidding Soon
1,171
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2022

April 1, 2022

Project location map

13125 TX-29, Liberty Hill, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.