Site work and new construction of a water / sewer project in Richmond, Texas. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
furnishing of all material, equipment, labor and supervision necessary or incidental to "Construction of Lift Station No. 8 for Fort Bend County MUD No. 58, Fort Bend County, Texas," Including but not limited to reinforced concrete wet well, wet well lining, valve vault, excavation and disposal, submersible pumps, hatches, sanitary sewer, force main, piping, valve and fittings, drainage, hose bibb, paving, driveway, access road, sidewalks, Type 7 ADA ramps, concrete stairs, equipment foundations, raised worker platform, manual transfer switch, bollards, wooden gate and fencing, site grading, junction box with type E inlet and flap gate valve, backflow preventer, dewatering, groundwater control system, coatings, hydro-much seeding, storm water pollution prevention during construction, trench safety system, natural gas generator, gas meter, electrical, controls and appurtenances. A cashier's check or bid bond in the amount of 5% of the total bid amount must accompany each bid. The successful bidder will be required to provide performance, payment and maintenance bonds for the full amount of the contract. The Owner reserves the right to reject any or all bids Including but not limited to reinforced concrete wet well, wet well lining, valve vault, excavation and disposal, submersible pumps, hatches, sanitary sewer, force main, piping, valve and fittings, drainage, hose bibb, paving, driveway, access road, sidewalks, Type 7 ADA ramps, concrete stairs, equipment foundations, raised worker platform, manual transfer switch, bollards, wooden gate and fencing, site grading, junction box with type E inlet and flap gate valve, backflow preventer, dewatering, groundwater control system, coatings, hydro-much seeding, storm water pollution prevention during construction, trench safety system, natural gas generator, gas meter, electrical, controls and appurtenances. Complete in Place.
Post-Bid
Water / Sewer
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2022
March 31, 2022
To Be Determined, Richmond, TX
Related To This Project
Richmond, TX
Bid Date: Feb 24 2022
Richmond, TX
Bid Date: Feb 24 2022
Richmond, TX
Bid Date: Mar 08 2022
Richmond, TX
Bid Date: Mar 07 2022
Richmond, TX
--
Richmond, TX
--
Richmond, TX
Bid Date: Mar 09 2022
Richmond, TX
Bid Date: Feb 18 2022
Richmond, TX
--
Richmond, TX
--
Richmond, TX
Bid Date: Mar 02 2022
Richmond, TX
Bid Date: Jan 06 2022
Richmond, TX
Bid Date: Jan 28 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.