Renovation of a water / sewer project in Huntsville, Texas. Conceptual plans call for the renovation of a water / sewer project.

UPDATE: https://www.huntsvilletx.gov/DocumentCenter/View/18559/FY-23-Budget-Book-- N. B. Davidson WWTP Rehabilitation Project A detailed scope has not yet been determined This project is included in the city's 2023-2027 Capital Improvement Plan (CIP). As of December 16, 2022, further details regarding design and construction have not been identified. _____________________________________________________ The City of Huntsville, TX (hereinafter referred to as the "City") invites Civil Engineers, Multi-Disciplinary Firms and any other qualified professionals, registered with the Texas Board of Professional Engineers, to submit qualifications to provide professional design engineering and construction support services for wastewater treatment plant rehabilitation & expansion improvement projects as listed below: PROJECT: N.B. Davidson Wastewater Treatment Plant (WWTP) Replacement Design, COH ID#: 21-10-07 N.B. Davidson Wastewater Treatment Plant (WWTP), also known as the South Plant, was originally constructed in 1971 with main treatment units consisting of an aeration basin (oval shaped tank with rotating disc aerators), a clarifier and sludge drying beds. The treatment plant was later improved in 1982 and 1994, with main additions consisting of another clarifier, new digesters and additional sludge drying bed area. The plant treats on an average 0.75 million gallons per day (MGD) and is at approximately 47% of design capacity. A condition assessment study of the plant in 2013 revelated that the plant needs major rehabilitation to contain increasing annual operation and maintenance costs and to eliminate the risks of catastrophic failure and possible TCEQ violation penalties. Disc aeration equipment in aeration basin (aeration basin is the "heart" of the treatment plant) is outdated and needs frequent maintenance, repairs, and replacement due to the aging. It is difficult to access and work on discs and bearings especially at the increased frequency due to aging. The gate valves and influent baffles in the headworks have rusted and are difficult to operate. Many elements in the clarifiers (gear box, bridge walkways, weirs, and baffles) have also deteriorated considerably. Maintenance of floating aerators, which were later added to the aeration basin to keep up with the needed treatment efficiency to meet TCEQ requirements are also adding up to increased cost of operation. The City's 2016 Water and Wastewater Condition and Capacity Assessment Studies concluded that the N.B. Davidson WWTP should be increased to a 2-hr peak flow treatment capacity from 4 million gallons per day (MGD) to 6.5 MGD. An increase in the 2-hr peak treatment capacity will prevent the collection system from surcharging during wet weather events and help the City maintain regulatory compliance. All questions regarding this solicitation should be directed by email to Lucy Gonzalez, Procurement Manager, at lgonzalez@huntsvilletx.gov. Questions may be submitted through 4:00 p.m., Wednesday, December 28, 2022. All questions after this timeframe will not be accepted. A response to the Questions will be posted by 4:00 PM, Wednesday, January 4, 2023. The method of contractor selection has not been determined at this time.

Conceptual

Water / Sewer

$15,000,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
270
Active Projects
172
Bidding Soon
3,554
All Active Projects
1,418
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 12, 2024

img_map_placeholder

1212 Avenue M, Huntsville, TX


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.