BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in New York, New York. Completed plans call for the renovation of a educational facility.

$500,001 - $1,000,000 Description: RPZ Backflow Prevention Devices Performance Period: 365 Continuous Calendar Days Liquidated Damages: One Thousand ($1,000)) Dollars per Continuous Calendar Day LIMITED SOLICITATION Only those bidders who have been specifically invited by the SCA, and are currently an active participant in the Mentor Program, are eligible to submit a bid and be awarded a contract under the referenced solicitation. Additionally, to be eligible for an award of the referenced work, the low responsive bidder must be able to demonstrate to the satisfaction of the SCA during the bid evaluation period, that all elements of the project necessary for successful completion of the project are included in its bid . INSURANCE See specific Contractor-furnished insurance requirements and SCA-furnished Insurance Coverage, the Owner Controlled Insurance Program (OCIP). The OCIP Manual is available at the following link BID BREAKDOWN: Upon request, the apparent low bidder for this project will be required to submit to the SCA/Construction Manager its bid breakdown using a Project Specific Template, within seventy-two (72) hours of the bid opening or when requested. PHASING EXHIBIT Attached, as Appendix B to the Construction Contract is the Phasing Exhibit for this Project. LUMP SUM BID Bidders shall submit a LUMP SUM BID AMOUNT in the form attached as Appendix A to the Construction Contract to complete the project within the "Performance Period" after normal school hours under the conditions specified in the Contract Documents (as defined in the SCAs General Conditions dated July 1, 2021) inclusive of the Phasing Exhibit. In connection with its Bid, the Contractor provided an appropriate bid bond/certified check, in the amount of five (5%) percent of its Bid Amount. Contractor shall make prompt payment to the HVAC, Plumbing and Gas Fitting, and Electrical Subcontractors. Within seven (7) calendar days of the receipt of any payment from the SCA, the Contractor shall pay to each such Subcontractor that portion of the proceeds of such payment representing the value of the Work performed by each such Subcontractor, based upon the actual value of the Subcontract which has been approved and paid for by the SCA, less an amount necessary to satisfy any claims, liens, or judgments against such Subcontractor, which have not been suitably discharged and less any amount retained by the Contractor as provided herein. The Subcontract may provide that the Contractor may retain not more than five (5%) percent of each payment to such Subcontractor, or not more than ten (10%) percent of each such payment, if prior to entering into the Subcontract, such Subcontractor is unable or unwilling to provide, at the request of the Contractor, a construction performance bond and a labor and material payment bond, both in the amount of the Subcontract. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Educational

$747,000.00

Public - City

Renovation

23

17

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
474
Active Projects
247
Bidding Soon
4,720
All Active Projects
2,187
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2022

April 8, 2022

img_map_placeholder

260 Pleasant Ave, New York, NY


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.