BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 20, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a road / highway in North Fort Myers, Florida. Completed plans call for site work for a road / highway.

Counties: Lee Road Name: Install and Establish Landscape at I 75 Limits: 12075000 Project(s): 40622575201(*) Federal Aid No: N/A Total Roadway Length: 0.585 Miles Contract Days: 855 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.585 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: The work under this Contract consist of Install and Establish Landscaping of I-75 at corkscrew interchange For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 003 Install and Establish Landscape Proposal Budget Estimate: $1,102,053.00

Award

Roads / Highways

$1,236,535.00

Public - State/Provincial

Site Work

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
63
Bidding Soon
1,091
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2022

May 16, 2022

Project location map

I-75, North Fort Myers, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.