BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 3, 2022 at 7:00 PM

Updated November 16, 2023

Site work and paving for a road / highway in Montesano, Washington. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The project includes all labor, materials and equipment to plane existing pavement surfaces as preparation for pre-level and final courses of Hot Mix Asphalt pavement and replacement of striping. Related utility work includes installation of approximately 1,100-feet of 6-inch and 8-inch C900 PVC water main including valves, fittings and appurtenances, reconnection to existing water meters; removal of sections of asphalt and concrete roadway, subgrade preparation, and related surface restoration including replacement of sidewalk panels. Bid proposals will be received only at the office of the City Administrator in the Montesano City Hall, 112 North Main Street, Montesano, Washington 98563. Proposals received after Wednesday March 2nd, 2022 at 11:00 a.m. will not be considered. All Work shall be substantially complete within thirty (25) working days after the date when the Contract Times commences or before June 30, 2022, whichever is sooner. All work shall be completed and ready for final payment within ten (10) working days after written notice of substantial completion.

Bid Results

Roads / Highways

$418,158.00

Public - City

Paving, Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
55
Bidding Soon
1,419
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2022

June 30, 2022

Project location map

Pioneer Ave E, Montesano, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.