Published March 23, 2022 at 8:00 PM
Updated October 1, 2024
Site work for a water / sewer project in Omaha, Nebraska. Completed plans call for site work for a water / sewer project.
The work consists essentially of the following estimated quantities: A PPROXIMATE QUANTITIES ITEM DESCRIPTION QUANTITY UNIT 1 CONSTRUCT 8" PVC SANITARY SEWER PIPE 1056 LF 2 CONSTRUCT 6" PVC SANITARY SEWER PIPE 159 LF 3 CONSTRUCT 54" I.D. SANITARY MANHOLE (5) 60 VF 4 INSTALL EXTERNAL FRAME SEAL 5 EA 5 REMOVE AND REPLACE EXISTING SANITARY SEWER 57 LF 6 CONSTRUCT TYPE B RIP-RAP FOR TRENCH STABILIZATION 60 TN 7 INSTALL BX1100 GEOGRID FOR TRENCH STABILIZATION 130 SY 8 INSTALL GEOTEXTILE FABRIC FOR TRENCH STABILIZATION 150 SY 9 CONSTRUCT FOUNDATION ROCK (3" CLEAN) FOR TRENCH STABILIZATION 40 TN 10 SEDIMENT BASIN MAINTENANCE 1 LS 11 REMOVE AND REPLACE EXISTING CONCRETE 22.5 SY Project includes furnishing all labor, tools, materials and equipment required to construct as SANITARY SEWER SYSTEM - SECTION IV for Sanitary and Improvement District 567, Douglas County, Nebraska, as per the plans and specifications for said work, at the locations shown on the detailed drawings and in the specifications now on file with the Clerk of said District and available at the office of E & A Consulting Group The amount of the engineer's estimate of the cost of said improvements (exclusive of engineering, fiscal, legal, interest, easement acquisition, and miscellaneous costs) All proposals must be submitted on bid forms furnished by E & A Consulting Group, and must be accompanied by an original bid bond or a certified check in the amount not less than $7,250.00 made payable to the Treasurer of Sanitary and Improvement District 567 as security that the bidder to whom the contract may be awarded will enter into a contract to build the improvements in accordance with this Notice to Contractor and will give a contract and maintenance bond in the amount of 100% of the total contract price, all as provided in the specifications. Bid bonds must be executed by a duly licensed corporate surety. Checks accompanying proposals not accepted shall be returned to the bidders. No bidder may withdraw his proposal for a period of sixty (60) days after date set for opening of bids. All proposals must be enclosed in an envelope, sealed and addressed to the "Clerk of Sanitary and Improvement District 567" and shall be marked "PROPOSAL FOR SANITARY SEWER SYSTEM - SECTION IV" with the bidder's name and address on said envelope. The Bid Security shall be in a separate sealed envelope attached to the Proposal envelope and shall be marked "BID SECURITY" with the project identified thereon. Proposals received after the above time shall be returned unopened to the bidder submitting the proposal. The work herein provided shall be done under written contract with the responsible bidder submitting the lowest acceptable bid in accordance with the requirements of the plans and specifications and as provided by law.
Bid Results
Water / Sewer
$148,118.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 8, 2022
April 7, 2022
Multiple Locations, Omaha, NE
Related To This Project
Omaha, NE
Bid Date: Mar 23 2022
Omaha, NE
Bid Date: Mar 23 2022
Omaha, NE
Bid Date: Feb 11 2021
Omaha, NE
Bid Date: Jun 21 2022
Omaha, NE
--
Omaha, NE
Bid Date: Jun 21 2022
Omaha, NE
Bid Date: Jun 21 2022
Omaha, NE
Bid Date: Jun 21 2022
Omaha, NE
Bid Date: Mar 24 2022
Omaha, NE
Bid Date: Mar 23 2022
Omaha, NE
--
Omaha, NE
Bid Date: Mar 24 2022
Omaha, NE
Bid Date: Mar 28 2022
Omaha, NE
Bid Date: Mar 23 2022
Omaha, NE
Bid Date: Mar 29 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.