BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Wilmington, North Carolina. Completed plans call for site work for a water / sewer project.

*The closed solicitation has been included below for reference: The Cape Fear Public Utility Authority (CFPUA) is seeking an engineering firm experienced with survey, design, permitting and construction services for sewer pump stations and force mains. The project is to serve northern New Hanover County by significantly increasing sewer conveyance capacity. The project consists of constructing a new major regional pump station in the general vicinity on North Kerr Avenue between Bavarian and Truesdale and constructing a large diameter sewer force main from the new pump station to the Northside Wastewater Treatment Plant. The approximate location of this infrastructure is identified on the attached map, Exhibit A. PHASE A Request for Qualifications is being advertised separately. The $32.8 million dollar project (PHASES A and B combined) is primarily funded by an ARPA grant through NC Wastewater Reserve funds which require strict adherence to project milestone dates. Therefore, the successful firm will be required to demonstrate their ability to meet these milestones without fail. A Preliminary Engineering Report is already in process. The funding agency requires that the Bid and Design Package be submitted no later than January 1, 2023. All ARPA project funds must encumbered for construction by December 31, 2024 to be paid out to contractors and reimbursed from the funding agency to CFPUA by December 31, 2026. The successful firm will have demonstrated success with projects and project accounting funded through North Carolina Division of Water Infrastructure. CFPUA will address questions regarding the RFQ until 2:00 PM on March 9, 2022. Questions concerning this advertisement should be directed to Julia Faircloth, Procurement Manager, Cape Fear Public Utility Authority, at bids@cfpua.org. The selected firm will be informed by the Preliminary Engineering Report and expected to begin route survey within 7 days of project award. If in the best interest of CFPUA, PHASES A and B of the project may be designed by different firms, but the work will occur simultaneously. All submitting firms are required to demonstrate how they can complete PHASE B of the project in its entirety on time, within budget and in accordance with Authority technical requirements The successful firm will demonstrate in their written qualifications the ability to succeed with such capacity of professional engineering services a project that includes: 1. Construction of a new approximately 4 million gallon per day sewer pump station on land adjacent to North Kerr Avenue; and 2. Construction of a sewer force main from the new pump station on North Kerr Avenue to Northside WWTP. Firms submitting Qualifications are encouraged to carefully check them for conformance to the requirements stated herein. Qualifications that do not meet ALL of the below listed requirements, or are sent to any address other than shown above, will be disqualified. No exception will be granted. Project Survey Award March 21, 2022 Project Design Award April 18, 2022 Project Bid and Design Package Submittal Complete December 16, 2022 Construction Final Completion August 1, 2026 All Project Payments Complete October 1, 2026 CFPUA Reimbursed for All Project Payments December 16, 2026 The method of contractor selection has not been determined at this time *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. NCDEQ DWI PROJECT No.: SRP-W-ARP-0062

Award

Water / Sewer

$29,485,040.00

Public - City

Site Work

189

35

8

8

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
55
Bidding Soon
708
All Active Projects
313
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 8, 2023

October 9, 2023

May 31, 2025

img_map_placeholder

Multiple Locations, Wilmington, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.