BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Boone, North Carolina. Contact the soliciting agency for additional information.

Written questions shall be emailed to talbotjd@appstate.edu by the date and time specified above. Vendor should enter "RFP # RFP55-021522: Questions" as the subject for the email. SCOPE: The Central Steam Plant on the campus of Appalachian State University in Boone, N.C. is seeking proposals for: 1. Annual Boiler Loop Tuning and Calibration 2. Annual Boiler BMS Safety Testing 3. Annual Server and Software Support We would also request current labor and travel rates for future field spot service and programming work. The Boiler Loop Tuning and Calibration scope will include providing up to a five working day on-site trip that will consist of calibration and combustion tuning for Natural Gas and #2 Diesel, on the Honeywell combustion control systems of each boiler. The following I/O points shall be a part of the scope: Boiler Combustion Control Point Calibration and Combustion Testing for Each Boiler as Applicable 1. Plant Master Control PV 2. Boiler Master Control Loop (Drum Pressure) 3. Combustion Air Control Loop (VFD & FB / Air Flow) 4. Gas Control Loop (Gas Valve & FB / Gas Flow) 5. Oil Control Loop (Oil Valve & FB / Oil Flow) 6. Feed Water Control Loop (Feed Water Valve & FB / Drum Level) 7. Furnace Pressure Control Loop (Stack Damper & FB / Furnace Pressure) 8. O2 Trim Loop 9. Boiler Steam Flow 10. Feed Water Flow 11. Windbox Pressure 12. Furnace Pressure 13. Boiler Outlet Pressure 14. Economizer Outlet Pressure 15. Economizer Outlet Temperature 16. Economizer Inlet Temperature 17. Economizer Outlet Water Temperature 18. Economizer Inlet Water Temperature 19. Gas Pressures 20. Oil Pressures 21. Feed Water Pressure 22. Atomizing Media Pressure The BMS Safety Testing PM scope will include an annual inspection and bench calibration for the safety switches for each of the four burner management systems, including safety switch status records. The following I/O points shall be included as part of this scope: Boiler Safety Switch Calibration and Testing for Each Boiler 1. High Steam Pressure 2. High Furnace Pressure 3. Low Combustion Air Pressure 4. Low Instrument Air Pressure 5. High Gas Pressure 6. Low Gas Pressure 7. Low Oil/Steam Differential Pressure 8. Low Atomizing Media Pressure 9. High Oil Pressure 10. Low Oil Pressure 11. High Pilot Gas Pressure 12. High Water Alarm Switch 13. Low Water Alarm Switch 14. Low Water Cut Out Switch Low Water Float Cut Out Switch

Post-Bid

Educational

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
171
Active Projects
104
Bidding Soon
1,336
All Active Projects
595
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 25, 2022

March 28, 2022

img_map_placeholder

287 Rivers St, Boone, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.