BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a civil project in Lester, Alabama. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Dupree Hollow Road Bridge Culvert Replacement. The length of this project is 0.065 miles. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. The entire project shall be completed in 45 working days. Cashier's check or bid bond for 5% of bid (maximum $10,000) are to be made payable to Limestone County and must accompany each bid as evidence of good faith. The bracket range is shown only to provide general financial information to contractors and bonding companies concerning the project's complexity and size. This bracket should not be used in preparing a bid nor will this bracket have any bearing on the decision to award this contract. In accordance with Section 34-8-8 of the Code of Alabama, as amended, states, "All owners, architects, and engineers receiving bids pursuant to this chapter shall require the person, firm, or corporation to include his or her current license number on the bid." It also states that "...it will be necessary for him or her to show evidence of license before his or her bid is considered." Prequalification is not required on this project. Further details and definitions regarding this provision are included in section 102 of special provision 18-LPA3 and ALDOT's Standard Specifications. Proof of insurance coverages of the types and amounts as set forth in the project specification will be required of the contractor and any and all subcontractors prior to beginning work. The contractor will be required to perform work amounting to at least 30% of the total contract cost with his own organization. This is a FEMA-funded project through Limestone County. The proposed work shall be performed in conformity with all applicable laws, rules, and regulations. The bidder's proposal must be submitted on the complete original proposal furnished him or her by Limestone County Engineering. The right to reject any or all bids is reserved.

Post-Bid

Bridges / Tunnels

$400,000.00

Public - County

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
22
Bidding Soon
455
All Active Projects
169
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2022

April 11, 2022

img_map_placeholder

Dupree Hollow Rd, Lester, AL


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.