Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 11, 2023 at 7:00 PM
Updated January 26, 2024
Renovation of a civil project in Empire, Ohio. Conceptual plans call for the renovation of a water / sewer project.
The Village of Empire intends to contract for engineering services in connection with the Wastewater Treatment Plant Improvements. Engineering firms interested in being considered for a contract to provide the required services should reply with a statement of qualifications Statements of qualifications should include information regarding the firm's history; education, and experience of owners and key technical personnel; the technical expertise of the firm's current staff; the firm's experience in performing engineering design, construction administration, and construction observation; availability of staff; the firm's equipment and facilities; and references. The preliminary project description is as follows: Name of Project: Village of Empire Wastewater Treatment Plant Improvements Location: Village of Empire, Ohio Description: Remove and Replace 50,000GPD Air Piping, Valves and Diffusions, Replace three (3) blowers with new control panel, Replace three (3) pumps in Nessley Pump Station, Replace three (3) pumps in WWTP Pump Station, Replace generator with ATS, Replace effluent vault concrete cover and Replace WWTP pump station concrete cover, Demolition and Mobilization. Total Project Budget: $563,815.00 Project Schedule: Anticipated dates for design startup/completion: March 1, 2022/September 1, 2022. Anticipated dates for construction startup/completion: January 1, 2023/July 1, 2024 The method of Contractor Selection has not been Determined at this time The engineer will accept questions for this project until 4:00 PM on Wednesday, March 1, 2023 by submitting any questions in writing to mail@wequicksall.com or fax (330) 339-2227. 1) Fort Steuben Maintenance Inc. $496,005.00 2 Ohio-West Virginia Excavating $999,264.00 3 W.E. Quicksall & Associates $505,745.00
Conceptual
Water / Sewer
$505,745.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 10, 2023
To Be Determined, Empire, OH
Related To This Project
Perrysburg, OH
Bid Date: Mar 16 2023
Ashland, OH
Bid Date: Apr 19 2023
Hunting Valley, OH
Bid Date: Mar 13 2023
Ashland, OH
Bid Date: Apr 19 2023
Akron, OH
Bid Date: Apr 06 2023
Gahanna, OH
Bid Date: Mar 07 2023
New Philadelphia, OH
Bid Date: Mar 08 2023
Brecksville, OH
Bid Date: Mar 10 2023
Dublin, OH
Bid Date: Mar 08 2023
Kent, OH
Bid Date: Mar 14 2023
Grove City, OH
Bid Date: Mar 10 2023
S Zanesville, OH
Bid Date: Mar 02 2023
Pataskala, OH
Bid Date: Apr 28 2023
Shaker Heights, OH
Bid Date: Mar 10 2023
Springfield, OH
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
