BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

New construction of an educational facility in Cumberland, British Columbia. Completed plans call for the construction of a 6,933-square-foot, one-story above grade educational facility.

The Board of Education School District No. 71 (Comox Valley)(SD71) wishes to retain the services of a qualified Construction Management firm to work with SD71, its Architect and sub-consultants, on the development of a new Childcare Centre on Egremont Road in the Village of Cumberland. The Cumberland Childcare Centre is a new facility that will be constructed on the site owned by SD71 and shared with Cumberland Community Elementary School. The elementary school will remain in full operation during the construction of the childcare building. The Construction Manager will be required to provide a safe, secure school environment for students, staff, and the general public during all construction activity. The current project schedule has construction activities starting in the spring of 2022 and completing approximately a year later. The new facility is to be occupied and ready to accept occupants for the start of the 2023/2024 school year. The project scope includes the modular construction of a new 642 m2 building neighbouring Cumberland Community Elementary School. The school will be occupied throughout the new construction program. The current project schedule has construction activities starting in the spring of 2022 and completing approximately a year later. The new facility is to be occupied and ready to accept occupants for the start of the 2023/2024 school year. The Cumberland Childcare design will be based on a wood frame modular construction approach that can be either factory-built, or site-built depending on factory availability and market conditions at the time of tendering. The foundation system will be either concrete strip footings and pony walls or poured in place concrete foundation walls and footings dependant on the project approach. These project deliverables and approach will be reviewed and confirmed with the successful CM once they are engaged and form part of the project team.

Award

Educational

$1,500,000.00

Public - State/Provincial

New Construction

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
8
Bidding Soon
178
All Active Projects
63
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2022

July 1, 2022

img_map_placeholder

Cumberland, Cumberland, BC

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.