BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 3, 2025 at 7:00 PM

Updated January 4, 2025

Site work and paving for a civil project in Spokane, Washington. Conceptual plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

Update: https://static.spokanecity.org/documents/budget/2025/adopted-2025-2030-citywide-capital-improvement-program.pdf This project will provide stormwater improvements with the arterial street project. The improvements will include separation and treatment from the combined sewer system. Portions of the project are also located within an area served by separated storm pipe. These areas are being evaluated for treatment. This is an integrated project. Project is included in City of Spokane Fiscal Year 2025-2030 Page no.479 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- UPDATE: https://static.spokanecity.org/documents/budget/2024/adopted-2024-2029-citywide-capital-improvement-program.pdf This project will provide stormwater improvements with the street project. The improvements will include separation and treatment from the combined sewer system. Portions of the project are also located within an area served by separated storm pipe. These areas are being evaluated for treatment. This is an integrated project. Project is in City of Spokane capital budget fy 2024-2029 CIP 438 _______________________________________________________________________________________________________________________ This project will provide stormwater improvements with the street project. The improvements will include separation and treatment from the combined sewer system. Portions of the project are also located within an area served by separated storm pipe. These areas are being evaluated for treatment. As of February 08, 2022, this project is currently in the FY 2023-2028 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$1,500,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
23
Bidding Soon
322
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2028

Project location map

W Broadway Ave, Spokane, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.