Renovation of a playground / park / athletic field in Spokane, Washington. Completed plans call for the renovation of a playground / park / athletic field.
CLARIFICATION DEADLINE 2/17/2023 3:00 PM The City of Spokane Parks Department is seeking bids for the Liberty Park Playground and Restroom Renovation Project. This project constitutes a public work under state law. On March 11, 2021, President Biden signed the American Rescue Plan Act (ARPA) into law, providing over $1.9 trillion in relief to address the continued impact of the COVID-19 pandemic on the economy, public health, State and local governments, individuals and businesses. This project is partially being funded using ARPA funds. 1. DEMOLITION OF EXISTING ASPHALT BASKETBALL COURT, CONCRETE WALKS, SITE FURNISHINGS, FOOTING, FLATWORK, EXISTING PLAY STRUCTURE WITH FOOTINGS, ABANDON UTILITIES AS INDICATED, REMOVAL OF EXISTING SIDEWALK AS INDICATED, REMOVAL OF TREES AS INDICATED, REMOVAL, SALVAGE, AND/OR DISPOSAL OF ALL DEMOLITION ITEMS AND OTHER WORK INDICATED IN THE CONTRACT DOCUMENTS. 2. EARTHWORK, GRADING AND BASE PREPARATION. CONSTRUCTION OF SIDEWALKS, UNIT PAVER PATHWAYS, CURBS, ASPHALT PATCH, CMU DUMPSTER ENCLOSURE, LANDSCAPE, IRRIGATION, ELECTRICAL AND LIGHTING IMPROVEMENTS. 3. THE FOLLOWING WORK WILL BE OWNER FURNISHED / OWNER INSTALLED. THE OWNER HAS ELECTED TO PURCHASE AND HAVE A SEPARATE CONTRACTOR INSTALL THE FOLLOWING: 3.1. PLAYGROUND EQUIPMENT 3.2. PLAYGROUND PROTECTIVE SURFACING 4. THE FOLLOWING WORK WILL BE CONTRACTOR FURNISHED / CONTRACTOR INSTALLED. THE CONTRACTOR SHALL PURCHASE AND INSTALL THE FOLLOWING: 4.1. SITE FURNISHINGS: BENCHES, DOG WASTE STATIONS, TRASH RECEPTACLES The Work of Project is defined by the Contract Documents and consists of the following: 1. Demolition of existing asphalt basketball court, concrete walks, site furnishings, footing, flatwork, existing play structure with footings, abandon utilities as indicated, removal of existing sidewalk as indicated, removal of trees as indicated, removal and disposal of all demolition items and other Work indicated in the Contract Documents. 2. Earthwork, grading and base preparation. Construction of sidewalks, unit paver pathways, curbs, asphalt patch, CMU dumpster enclosure, landscape, irrigation, electrical and lighting improvements. 3. Alternates include renovations to the existing restroom, dumpster enclosure and electrical renovations.
Bid Results
Playgrounds / Parks / Athletic Fields
$254,571.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 27, 2023
March 29, 2023
500 S Pittsburg St, Spokane, WA
Related To This Project
Spokane, WA
Bid Date: Feb 08 2023
Spokane, WA
Bid Date: Mar 03 2023
Spokane, WA
Bid Date: Mar 10 2023
Spokane, WA
--
Spokane, WA
Bid Date: Feb 07 2023
Spokane, WA
--
Spokane, WA
--
Spokane, WA
Bid Date: Jan 26 2023
Spokane, WA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.