Published April 18, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a playground / park / athletic field in Spokane, Washington. Completed plans call for the renovation of a playground / park / athletic field.

CLARIFICATION DEADLINE 2/17/2023 3:00 PM The City of Spokane Parks Department is seeking bids for the Liberty Park Playground and Restroom Renovation Project. This project constitutes a public work under state law. On March 11, 2021, President Biden signed the American Rescue Plan Act (ARPA) into law, providing over $1.9 trillion in relief to address the continued impact of the COVID-19 pandemic on the economy, public health, State and local governments, individuals and businesses. This project is partially being funded using ARPA funds. 1. DEMOLITION OF EXISTING ASPHALT BASKETBALL COURT, CONCRETE WALKS, SITE FURNISHINGS, FOOTING, FLATWORK, EXISTING PLAY STRUCTURE WITH FOOTINGS, ABANDON UTILITIES AS INDICATED, REMOVAL OF EXISTING SIDEWALK AS INDICATED, REMOVAL OF TREES AS INDICATED, REMOVAL, SALVAGE, AND/OR DISPOSAL OF ALL DEMOLITION ITEMS AND OTHER WORK INDICATED IN THE CONTRACT DOCUMENTS. 2. EARTHWORK, GRADING AND BASE PREPARATION. CONSTRUCTION OF SIDEWALKS, UNIT PAVER PATHWAYS, CURBS, ASPHALT PATCH, CMU DUMPSTER ENCLOSURE, LANDSCAPE, IRRIGATION, ELECTRICAL AND LIGHTING IMPROVEMENTS. 3. THE FOLLOWING WORK WILL BE OWNER FURNISHED / OWNER INSTALLED. THE OWNER HAS ELECTED TO PURCHASE AND HAVE A SEPARATE CONTRACTOR INSTALL THE FOLLOWING: 3.1. PLAYGROUND EQUIPMENT 3.2. PLAYGROUND PROTECTIVE SURFACING 4. THE FOLLOWING WORK WILL BE CONTRACTOR FURNISHED / CONTRACTOR INSTALLED. THE CONTRACTOR SHALL PURCHASE AND INSTALL THE FOLLOWING: 4.1. SITE FURNISHINGS: BENCHES, DOG WASTE STATIONS, TRASH RECEPTACLES The Work of Project is defined by the Contract Documents and consists of the following: 1. Demolition of existing asphalt basketball court, concrete walks, site furnishings, footing, flatwork, existing play structure with footings, abandon utilities as indicated, removal of existing sidewalk as indicated, removal of trees as indicated, removal and disposal of all demolition items and other Work indicated in the Contract Documents. 2. Earthwork, grading and base preparation. Construction of sidewalks, unit paver pathways, curbs, asphalt patch, CMU dumpster enclosure, landscape, irrigation, electrical and lighting improvements. 3. Alternates include renovations to the existing restroom, dumpster enclosure and electrical renovations.

Bid Results

Playgrounds / Parks / Athletic Fields

$254,571.00

Public - City

Renovation

23

22

10

7

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
23
Bidding Soon
320
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2023

March 29, 2023

Project location map

500 S Pittsburg St, Spokane, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.