Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a water / sewer project in Palm Desert, California. Completed plans call for the renovation of a water / sewer project.
Online Q&A Deadline March 24, 2022 4:00 PM (PST) Scope of work includes providing engineering design services to maximize treatment capacity by constructing new influent pump stations, headworks, odor control, screening, grit removal, storage, flow split structure, instrumentation & controls, and septage improvements, while achieving the following objectives: o Wetwell Storage & Equalization Structure, including septage storage tank o Address the flow and loading projections based on the recent residential growth; o Increase plant redundancy and reliability - including emergency standby electrical power; o Position WRP-10 for logical and modular future expansion beyond 2040 flow and loading requirements; o Prepare the WRP 10 to meet future and restrictive regulations without sacrificing previous expenditures on plant upgrades Water Reclamation Plant No. 10 (WRP 10) is owned and operated by CVWD. WRP 10 is located in the City of Palm Desert. It is an 18 million gallon per day (MGD) plant that contains three separate activated secondary treatment trains, referred to as Plant A, Plant B, and Plant C with rated hydraulic capacities of two (2) MGD, eight (8) MGD, and eight (8) MGD, respectively. WRP 10 currently operates with an average daily influent flow of 7.8 MGD and a peak daily flow of approximately 10 MGD. The projected average day flow rate for year 2045 is 14.0 mgd. CVWD intends to initiate this Project on May 09, 2022 with anticipated design completion by October 30, 2023 The purpose of the proposed expansion is to maximize treatment capacity by constructing new influent pump stations, headworks, odor control, screening, grit removal, storage, flow split structure, emergency standby electrical power and septage improvements, while addressing automation, redundacy, scada control, flow equalization, and efficiency.
Post-Bid
Water / Sewer
$1,300,000.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 13, 2022
June 13, 2022
43000 Cook St, Palm Desert, CA
Related To This Project
Palm Desert, CA
Bid Date: Feb 22 2022
Palm Desert, CA
Bid Date: Feb 25 2022
Palm Desert, CA
Bid Date: Feb 22 2022
Palm Desert, CA
Bid Date: Feb 21 2020
Palm Desert, CA
Bid Date: Mar 16 2022
Palm Desert, CA
Bid Date: Nov 17 2020
Palm Desert, CA
Bid Date: Jun 22 2020
Palm Desert, CA
Bid Date: Jun 07 2022
Palm Desert, CA
--
Palm Desert, CA
Bid Date: Feb 25 2022
Palm Desert, CA
Bid Date: Dec 13 2022
Palm Desert, CA
Bid Date: Dec 07 2022
Palm Desert, CA
--
Palm Desert, CA
Bid Date: Dec 07 2022
Palm Desert, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Try it free. The data you need to build the relationships you want.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.