BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Lexington, Kentucky. Completed plans call for site work for a water / sewer project.

As of 03/16/2022 This project has not been awarded. The time for substantial completion for all phases shall be five (5) Calendar Days and Final Completion shall be two (2) days thereafter. Substantial Completion will include all site restoration completed, site clean-up and fully functional. Contractor to Locate All Utilities Prior to Start of Work. Directional Bore and Pull Back (2) 4" Conduits From Man-hole U228 to New Pull Box by the Baseball Stadium and New Pull Box Across Alumni Drive. Directional Bore and Pull Back (1) 4" Conduit From Visitor Center Building to the New Pull Box Across From Alumni Drive. Scope Includes Installation Total of (5) 24" X 36" Quazite Pull Boxes With a Traffic Rated Tier 22 Lid. See Drawings for Locations of Pull Boxes. Install (1) New Pull Box Outside the Visitor Center Building. Intersecting the Existing 2 X 1 1/4 " Telecom Conduit Leading Into the Building. Seed and Straw Any Disturbed Areas. Contractor Will Not Park Vehicles on the Grass or Side of Roads. Remove All Construction Debris and Trash When Compelte. Uk Is a Non-smoking Campus, This Includes the Arboretum Area. All Work to Be Coordinated & Communicated With Uk Its Before Starting and During the Installation. All bids shall be accompanied by a bid guarantee of not less than five (5%) percent of the amount of the base bid. A 100% Performance Bond and 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instruction to Bidders, General Conditions and Special Conditions. No bidder may withdraw his bid for a period of sixty (60) days after the date set for the opening of bids. Clerical errors and omissions in the computation of the lump sum shall not be cause for withdrawal of the bid without forfeiture of bid bond. Bids may be withdrawn in person only, prior to the closing date for receipt of bids. The University of Kentucky, Construction Procurement Section, reserves the right to reject any and all bids and to waive all formalities and/or technicalities where the best interest of the University may be served. Anyone wishing to discuss specific items is requested to submit the items in writing to Mike Guyette Construction Procurement, no later than 2PM on 02/28/2022. Written questions can be submitted by email to: cckbidquestions@uky.edu The scope of the project is to run 12/12 strand single mode/om1 fiber From the dorotha smith oatts visitor center bldg. 0302 room 109 to the uk baseball facility bldg. 0682 room c006a to Connect to the UKcampus network. This will involve running 3000 feet Of single mode/om4 fiber from bldg. 302 to bldg. 682. The above to be Performed by UK its

Award

Water / Sewer

$61,616.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
232
Active Projects
133
Bidding Soon
1,574
All Active Projects
780
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 11, 2022

April 11, 2022

April 18, 2022

img_map_placeholder

To Be Determined, Lexington, KY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.