Published June 6, 2021 at 8:00 PM
Updated September 14, 2023
Demolition, site work and asbestos abatement for an educational facility in Lexington, Kentucky. Completed plans call for the demolition of a educational facility; for site work for a educational facility; and for asbestos abatement for a educational facility.
The scope of work shall include all work indicated in the Work Category Description EARLY DEMOLITION & ABATEMENT, and Division 01 General Requirements and Division 02 Existing Condition The following items represent specific inclusions in this Contract EARLY DEMOLITION & ABATEMENT. They are provided as a guide to aid in the assignment of work and in no way should be construed as being all inclusive. All work described or indicated in the respective specification sections or divisions listed above, and on the drawings, shall be included, unless specifically noted otherwise TRADE PACKAGE 1: EARLY DEMOLITION & ABATEMENT 1. This subcontractor is responsible for all layout/surveying associated with this work. 2. This subcontractor is responsible for all cleanup associated with this work. 3. This subcontractor is responsible for coordination with all other subs on this projects it relates to this scope of work. 4. This subcontractor is responsible for all permits, fees, and inspections associated with this work. 5. This subcontractor is responsible for providing as much dumpster yardage as necessary for this work. 6. This subcontractor is responsible for providing and maintaining temporary toilets and hand washing stations throughout the course of this work. 7. This subcontractor is responsible for providing any signage needed on the project. 8. This subcontractor is responsible for the final cleaning on the project upon the completion of this work. 9. This subcontractor is responsible for the temporary fence and tree protection as shown on the logistics plan for the duration of this work. 10. This subcontractor is responsible for all demo on the project. 11. This subcontractor is responsible for any temporary enclosures or safety barricades needed throughout this work. This work will also include keeping window and door openings enclosed throughout the duration of this work. 12. There is only one bid package. This subcontractor is responsible for all work associated with the contract drawings and specifications, NO EXCEPTIONS. The time for substantial completion for all phases shall be forty-two (42) Consecutive Calendar Days and Final Completion shall be fourteen (14) days thereafter. Substantial Completion will include all site restoration completed, site clean-up and fully functional. All bids shall be accompanied by a bid guarantee of not less than five (5%) percent of the amount of the base bid. A 100% Performance Bond and 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instruction to Bidders, General Conditions and Special Conditions. Performance and Payment Bonds shall be in favor of Dean Builds, Inc. as the oblige. Anyone wishing to discuss specific items is requested to submit the items in writing to Matthew Spalding Capital Construction Procurement, no later than May 25, 2021 @ 1:00 PM. Written questions can be submitted by email to: matthew.spalding@uky.edu AND sbowlin@uky.edu or fax to 859.257.1951. Note: Responses to Written Questions received no later than May 25, 2021 @ 1:00 PM will be provided in an addendum. The University of Kentucky, Construction Procurement Section, reserves the right to reject any and all bids and to waive all formalities and/or technicalities where the best interest of the University may be served. The project value listed reflects the total project estimate.
Bid Results
Educational
$155,000.00
Public - State/Provincial
Asbestos Abatement, Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.