Site work and paving for a mixed-use development in Hartland, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Project involves approximately 34,000 S.Y. of partial depth asphalt milling and overlay, 9,200 S.Y. of asphalt pulverizing and repaving, 430 L.F. of trail repaving, 2,500 S.Y. of parking lot reconstruction, base patching, concrete curb and gutter replacement, concrete sidewalk and ADA ramp removal and replacement, asphalt and concrete driveway removal and replacement, asphalt binder and surface course paving, structure adjustments and repairs, pavement markings, erosion control, miscellaneous pavement patching, traffic control, and restoration. Est. Value:$ 1,000,000.00 All Work is included in a single prime contract. Bidding Documents, including Drawings and Specifications, may be examined at the offices of Village of Hartland and the Consulting Engineer during regular business hours. Construction time is of the essence. Completion delays are subject to liquidated damages. The Village of Hartland reserves the right to accept the most advantageous Bid, or to reject any and all Bids. Award of Work described herein is subject to the provisions of the Wisconsin Statutes. Partial sets of Bidding Documents are not available. Neither Owner, Engineer nor Issuing Office is responsible for full or partial sets of Bidding Documents, including any Addenda, obtained from other sources. The cost of Bidding Documents is non-refundable. Each entity obtaining Bidding Documents from the Issuing Office will be designated as a Plan Holder of Record. Bids received from entities who are not Plan Holders of Record may be returned as being nonresponsive. A Bidder's qualification statement must be delivered to Village of Hartland at least 5 days before the Bid opening date. If the successful Bidder fails to execute the Contract and furnish payment and performance bonds within 15 days after the award, the Check or Bid Bond may be forfeited to Village of Hartland as liquidated damages.

Bid Results

Roads / Highways

$1,048,973.00

Public - City

Paving, Site Work

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
49
Bidding Soon
1,159
All Active Projects
511
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2022

May 9, 2022

img_map_placeholder

Multiple Locations, Hartland, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.