BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 3, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a road / highway in Reedsburg, Wisconsin. Completed plans call for site work for a road / highway.

Utility Street Construction and Excavation, Trenchless Utility Construction, Fiber Optics ARPA Fiber Network Expansion - to include: expansion of the existing Fiber Optic Network for the Reedsburg Utility Commission. The total expansion will be approximately 500 miles through parts of Sauk County, Richland County and Iowa County. The Reedsburg Utility Commission will supply the hardware materials (fiber optic cable, drop cable, pedestals, hand holes, utility-ducts, ground rods, fiber warning ribbon, tracer wire) for the expansion. The expansions are divided up into four contracts: White Mound, Iowa, Witwen, and Happy Hill, with separate bid schedules for each section. Each section consists of the following: Contract A - White Mound - approximately 167 miles of mainline fiber that will pass approximately 682 locations, Contract B - Iowa - approximately 90 miles of mainline fiber that will pass approximately 502 locations, Contract C - Witwen - approximately 160 miles of mainline fiber that will pass approximately 692 locations, Contract D - Happy Hill - approximately 105 miles of mainline fiber that will pass approximately 432 locations. Schedule A - White Mound - Five Star Energy Services, LLC - Apparent low - 5,081,033 Schedule B - Iowa - Five Star Energy Services, LLC - Apparent low - 3,042,873 Schedule C - Witwen - Michels Power, Inc - Apparent low - 4,263,236 Schedule D - Happy Hill - Five Star Energy Services, LLC - Apparent low - 3,353,355

Award

Roads / Highways

$15,740,497.00

Public - City

Site Work

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
51
Bidding Soon
789
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2022

May 9, 2022

Project location map

To Be Determined, Reedsburg, WI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.