Published April 21, 2025 at 8:00 PM
Updated April 22, 2025
Site work and paving for a road / highway in Oak Park, Illinois. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
Update:This project consists of streetscaping on North Avenue from Harlem to Central. Previous streetscaping from Harlem to Oak Park was completed in 2006 so more minor improvements are planned in this section for some safety modifications and median modification. The State allocated $27.4M for this project to the City of Chicago and they will oversee the design and construction on both sides of the street. The Village and CDOT previously worked together on a transportation study of North Avenue as well as an economic development stud which included recommendations for some of this work. Project is included in Village of Oak Park Fiscal Year 2025-2029 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- https://www.oakpark.com/2025/02/03/infrastructure-costs-top-river-forests-capital-plan/ Infrastructure costs top River Forest's capital plan $5.3 million budget includes $125,000 for Harlem Avenue viaduct project Infrastructure improvements and maintenance headed the list of the five-year capital improvement plan unveiled at the River Forest Village Board meeting Jan. 27. In his presentation, Matt Walsh, village administrator, said capital expenditures are estimated to be $33 million over the next five years, $5.3 million of which is expected to be spent in the first year, Fiscal Year 2026, which begins May 1. Major funding for FY2026 will come from the capital improvement fund, $1.4 million; the water and sewer fund, $1.1 million; and the capital equipment replacement fund, $1 million. Of the FY2026 capital expenses, $2.4 million will be allocated for streets, sidewalks and alleys and $991,000 for water and sewer improvements. Unveiling the capital improvement plan is the first step of the budget process. Officials said the plan is generally amended during the budget process as determinations are made for items to be moved forward or to be deferred based on current information. In April, a budget will be prepared and recommended to the village board, which will take input from residents, if there is any, at a public hearing. The final step in the process will be adoption of the budget, which also is expected in April. The streets, sidewalks and alleys capital expenses include work on the North Avenue streetscape project, $402,810; the electric charging stations project, $597,392; the Des Plaines River Trail project, $75,000; and the Harlem Avenue viaduct project, $125,000. All four are either partially or fully funded by grants. Outside of the projects, the streets, sidewalks and alleys expenses include $625,000 for street improvements; $250,000 for sidewalk, curb and gutter maintenance; and $100,000 for the street patching program. The capital expenses for water and sewer improvements include $230,000 for expenses related to the ongoing lead service line replacement effort, $150,000 for the subsidy program and $80,000 for the inventory and replacement. Other water and sewer expenses include $175,000 for water main replacements; $140,000 for sewer lining; $135,000 for replacing one of three pumps at the pumping station; and $100,000 for work on the stormwater master plan. Village President Cathy Adduci said she hoped officials are “keeping an eye” on the stormwater master plan. “I am willing to roll up my sleeves and work with our state legislators to obtain funding we need for this,” she said. “I’m taking this seriously and want to make sure we don’t lose sight of it.” Other big-ticket items include replacing the 30-year-old backup generator in Village Hall, $350,000; a new aerial truck for public works, $240,000; a new sewer televising system, $150,000; and installing solar panels on the roof of the public works garage, $131,000. Because of the comparatively low energy consumption levels at the garage, a 55-kilowatt system would result in the facility being net zero, meaning the rooftop solar installation would generate as much energy annually as is consumed by the facility, Seth Jansen, management analyst, said. Because the electricity at the garage is paid through the village’s franchise agreement with ComEd, the monetary savings would be realized through a reduction in the franchise fee appearing on residents’ ComEd bills although Jansen cautioned the savings will not be realized immediately. In addition, installation of the solar panels will help the village achieve EV Readiness gold certification. After rebates and incentives, the anticipated cost is about $37,000. Staff will seek grant funding to further offset the cost of the project. Adduci also thanked Walsh and the staff for preparing the capital improvement plan, noting, “I know how difficult this task is.” ----------------------------------------------------------------------------- This project consists of streetscaping on North Avenue from Oak Park Avenue to Austin Boulevard with some safety modifications and median modification from Harlem to Oak Park Ave and is intended to be a shared project with the City of Chicago. The Village and CDOT previously worked together on a transportation study of North Avenue as well as an economic development stud which included recommendations for some of this work. IDOT is also planning a SMART corridor along North Ave to improve traffic flow and the Village entered into a Letter of Intent with the State for this work. As of June 21, 2023, this project is included in the Village of Oak Park's FY 2023-2027 Budget CIP and funding allotted for construction in FY 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$4,000,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2028
W North Ave, Oak Park, IL
Related To This Project
Oak Park, IL
Bid Date: Jul 12 2023
Oak Park, IL
--
Oak Park, IL
Bid Date: Jul 28 2023
Oak Park, IL
Bid Date: Jul 19 2023
Oak Park, IL
Bid Date: Aug 17 2023
Oak Park, IL
Bid Date: Aug 04 2023
Oak Park, IL
Bid Date: Aug 04 2023
Oak Park, IL
Bid Date: Jun 29 2023
Oak Park, IL
Bid Date: Jun 30 2023
Oak Park, IL
Bid Date: Jun 15 2023
Oak Park, IL
Bid Date: May 26 2023
Oak Park, IL
Bid Date: May 26 2023
Oak Park, IL
Bid Date: May 22 2023
Oak Park, IL
Bid Date: Jun 01 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.