Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a laboratory facility in Golden, Colorado. Completed plans call for the renovation of a laboratory facility.
The National Renewable Energy Laboratory (NREL) is a national laboratory of the U.S. Department of Energy (DOE), Office of Energy Efficiency and Renewable Energy (EERE), operated and managed by the Alliance for Sustainable Energy, LLC. NREL advances the science and engineering of energy efficiency, sustainable transportation, and renewable power technologies and provides the knowledge to integrate and optimize energy systems. Located in the foothills of Golden, Colorado, NREL is the only federal laboratory dedicated to the research, development, commercialization, and deployment of renewable energy and energy efficiency technologies. This project is to replace the two chemical feed cabinets in Science and Technology Facility (S&TF) and connect them back into the existing process. These cabinets provide Sodium Hydroxide and Sulfuric Acid to the three scrubbers and the automatic waste neutralization tanks. Original design of the Process Development and Integration Laboratory (PDIL) Cleanroom automated waste neutralization (AWN) system was to operate 24/7, however the need of the research requires an intermittent operation. As a result, the delivery components and building automation system (BAS) controls will be updated by NREL. The chemical feed cabinets shall have a standalone programmable logic controller (PLC) that will interface with the BAS. This project will require Vendor and Construction services to provide for replacement of the two chemical feed cabinets and delivery component, programming, and controls of the S&TF chemical delivery system to the AWN that meets the requirements provided in Exhibit A and B. This subcontract will also provide a pump cart as detailed in Exhibit A and B. Subcontractor must have successfully completed similar chemical feed secondary containment automated waste neutralization projects in the past five years. Equipment vendor shall have available support within the United States of America. Location: Offerors shall have a bona-fide office located within 100 miles or shall be able to demonstrate their capability to perform in these areas: National Renewable Energy Laboratory (NREL) South Table Mountain Campus (STM) 15013 Denver West Parkway Golden, CO 80401 and National Renewable Energy Laboratory (NREL) Flatirons Campus (FC) 19001 W. 119th Avenue Arvada, CO 80007 Other Requirements: No contract award will be made to any contractor that is not registered or in the process of registering with the System for Award Management (SAM). Please visit the SAM website at https://sam.gov/content/entity-registration for instructions on how to register. 1. PROVIDE A DESIGN TO REPLACE THE DELIVERY COMPONENTS OF THE ACID WASTE NEUTRALIZATION (AWN) SYSTEM WITH TWO NEW CABINETS, ONE FOR SULFURIC ACID AND ONE FOR SODIUM HYDROXIDE. 2. NEW SYSTEM TO PROVIDE INTERMITTENT OPERATION OF THE SYSTEM. 3. PREVENT FREEZING OF THE SODIUM HYDROXIDE PIPING AND COMPONENTS. 4. NEW COMPONENTS WILL BE COMPATIBLE WITH 95% SULFURIC ACID AND SODIUM HYDROXIDE AS APPROPRIATE TO THE RESPECTIVE SYSTEMS. 5. CONTROLS FOR THE NEW SYSTEM WILL BE TIED TO THE BAS. 6. SECONDARY CONTAINMENT IS PROVIDED VIA THE CABINETS AND IS DESIGNED TO 1.5 TIMES THE DRUM CAPACITY. 7. ADD ALTERNATE: PROVIDE TWO ADDITIONAL CABINETS OF SIMILAR CONSTRUCTION TO THE ABOVE FOR NREL USE. Technical questions are due by 3/23/2022 by 5:00 P.M. MST
Post-Bid
Laboratories
$100,000.00
Public - Federal
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 15, 2022
May 16, 2022
Multiple Locations, Golden, CO
Related To This Project
Golden, CO
Bid Date: Apr 18 2022
Golden, CO
Bid Date: May 04 2022
Golden, CO
Bid Date: May 19 2022
Golden, CO
--
Golden, CO
Bid Date: Apr 08 2022
Golden, CO
Bid Date: Apr 01 2022
Golden, CO
Bid Date: Jul 27 2021
Golden, CO
Bid Date: Jun 30 2020
Golden, CO
--
Golden, CO
Bid Date: Mar 15 2022
Golden, CO
Bid Date: Apr 29 2022
Golden, CO
Bid Date: Apr 28 2022
Golden, CO
--
Golden, CO
Bid Date: May 04 2022
Golden, CO
Bid Date: Apr 22 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.