BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 14, 2025 at 8:00 PM

Updated May 15, 2025

Site work, paving and outdoor lighting for a mixed-use development in Sheboygan, Wisconsin. Conceptual plans call for site work for a sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

UPDATE :The parking lots located at the Riverfront are beyond their useful life. Annual maintenance includes asphalt patching, crack filling and sweeping. These lots still contain the original asphalt which is over 30 years old. The project would address storm sewer issues that exist in several locations and required upgrades to electrical wiring of parking lot lighting. These lots have a Paser rating of four. Project is in City of Sheboygan capital budget fy 2025-2029 CIP ______________________________________________________________________ Update:https://www.sheboyganwi.gov/wp-content/uploads/2024/03/2024-2028-CIP-FINAL.pdf Riverfront Parking Lots - 2024302 Project is included City of Sheboygan Fiscal Year 2024-2028 page no 104 ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Strategic Plan Focus Area(s): Quality of Life, Infrastructure and Public Facilities, Economic Development, Neighborhood Revitalization. The parking lots located at the Riverfront are beyond their useful life during this Capital Improvements Program cycle (2020-2024). Annual maintenance includes asphalt patching, crack filling and sweeping. These lots still contain the original asphalt which is over 30 years old. The project would address storm sewer issues that exist in several locations and required upgrades to electrical wiring of parking lot lighting. These lots have a Paser rating of four. As of February 21, 2023, this project is currently in the City of Sheboygan 2023-2027 Capital Improvement Plan (CIP). Funding for this project is allotted in the City's Capital Improvement Plan for construction FY 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Sidewalks / Parking Lot

$750,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
106
Bidding Soon
945
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2026

Project location map

Riverfront Dr, Sheboygan, WI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.