BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Tierra Amarilla, New Mexico. Conceptual plans call for site work for a bridge / tunnel; and water / sewer project.

As of June 15, 2023, per owner, the project has been delayed but it will still happen in the future. Estimated to post the project early 2024. ---------------- AMENDED SOURCES SOUGHT FOR THE EL VADO DAM SPILLWAYS AND DAM CREST MODIFICATIONS PROJECT The Bureau of Reclamation Acquisition Management Division, Provo Area Office in collaboration with Albuquerque Area Office, issues this special notice number DOIRFBO220012 for the El Vado Dam Spillways and Dam Crest Modifications Project, located in North Central New Mexico. This notice is for the purpose of determining potential offerors to act as the prime contractor for this project. This determination includes availability, capability, and small business status to support the project. THIS IS NOT A REQUEST FOR PROPOSALS, QUOTE, OR AN INVITATION FOR BIDS and does not constitute any commitment by the Government. No reimbursement will be made for any costs associated with providing information in response to this notice. All interested sources must respond to future solicitation announcements separately from responses to the sources sought notice. The information obtained may be used for the future solicitation and all interested parties must respond to future solicitation announcement separately. PRINCIPAL COMPONENTS OF THE PROJECT: The following are the principal components of the work necessary to complete the project: A. Existing service spillway includes removal of existing service spillway (concrete crest structure, and steel lined chute), including radial gate and associated mechanical equipment, and removal of existing highway bridge. B. Existing dam crest features Includes removal of existing wave suppressor (and supporting steel and concrete members), top few feet of existing steel plates on dam face. C. Temporary soil nail stabilization along left inlet wall of existing concrete service spillway. After installation of soil nails, existing concrete floor of service spillway will be sawcut and removed. D. Excavation of approximately top 7 feet for over 1000 lineal feet of dam crest. E. Excavation for new service spillway alignment, including side slopes and for drainage system. F. Temporary excavation support/stabilization with untensioned rock dowels and shotcrete facing reinforced with welded wire reinforcement. Drainage behind the shotcrete facing will consist of geo-composite strip drains centered between each column of rock dowels. G. HDPE pipes, sand, gravel and access boxes for foundation drainage downstream of the crest and backfill drainage behind the crest structure walls. H. Reinforced concrete, lean concrete, concrete for mud mat, and test slab. I. Grouted anchor bars, foundation anchors, stoplog gate guides, and railings. J. Miscellaneous and structural backfill. K. Radial gate, gate operator, and gate hoists include coatings and galvanic anode cathodic protection, and heating elements. L. Power, gate controls and indicators, communications (i.e., SCADA), and engine generator set. M. Highway bridge with guardrails. N. Gate hoist deck with railings and ladders. O. Right abutment access road with guardrails. P. Dam crest modifications includes earthwork, upstream reinforced concrete parapet wall (with fencing), aggregate base course, asphalt pavement, and downstream guardrail. Q. Extension of the geomembrane composite from elevation 6905 to the base of the new concrete parapet wall, geomembrane composite placement over the existing left concrete parapet wall on dam crest, and the lean concrete backfill area along the left side of the new spillway approach wall. R. A zoned freeboard dike /fuse plug at the emergency spillway. S. Impressed current cathodic protection system. T. Protect, preserve, and abandon various piezometers and survey measurement points along the dam. Install QUESTIONS Questions regarding this notice shall be submitted in writing, through e-mail, referencing DOIRFBO220012 El Vado Dam Spillway to the Contracting Officer, Lisa Vance at lvance@usbr.gov no later than Wednesday August 24th, 2022 by close of business. The method of contractor selection has not been determined at this time.

Conceptual

Bridges / Tunnels

$86,000,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
14
Bidding Soon
202
All Active Projects
79
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 28, 2024

img_map_placeholder

To Be Determined, Tierra Amarilla, NM

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.