BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 25, 2023 at 8:00 PM

Updated January 26, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Breckenridge, Minnesota. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

8406-23 (TH 75=006) STBG 8423(042) In Wilkin County on TH 75 from 850' North of 460th St to 775' South of 457th St Grading, Concrete Pavement, Bituminous Surfacing, Bridge No. 84011 0.170 Miles DBE 6.3 MNDOT - 015 - Grading, Concrete Pavement, Bituminous Surfacing, Bridge No. 84011 Starting Date: 6/5/2023 Completion Date: 10/15/2023 The workforce participation goals for this Project are: Minority: 12% Women: 9% The DBE goal for this project is 6.3 %

Award

Bridges / Tunnels

$3,570,691.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

82

5

5

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
20
Bidding Soon
242
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2023

June 5, 2023

Project location map

US-75, Breckenridge, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.