BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 20, 2025 at 8:00 PM

Updated May 21, 2025

Site work and paving for a road / highway in Mankato, Minnesota. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Update:https://www.mankatomn.gov/home/showpublisheddocument/15115/638717534453070000 The reconstruction of Rita Road from Monks Avenue to End. This project will consist of replacing watermain, sanitary sewer and stormwater utilities. This street is the first phase of the Rita Road Neighborhood Construction Plan. This neighborhood is one of the few remaining without underdrain. The watermain in this area is from the late-1950s and made of cast iron. Cast iron is susceptible to corrosion and rusting over time. The sanitary sewer in this area is from the late-1950s and is made of vitrified clay. Vitrified clay is susceptible to root intrusion and leaks over time. Project is included City of Mankato Fiscal Year 2025-2029 Page No 57 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Update:https://www.mankatomn.gov/home/showpublisheddocument/14014/638460236417300000 The reconstruction of Rita Road from Monks Avenue to End. This project will consist of replacing watermain, sanitary sewer and stormwater utilities. This street is the first phase of the Rita Road Neighborhood Construction Plan. This neighborhood is one of the few remaining without underdrain. The watermain in this area is from the late-1950s and made of cast iron. Cast iron is susceptible to corrosion and rusting over time. The sanitary sewer in this area is from the late-1950s and is made of vitrified clay. Vitrified clay is susceptible to root intrusion and leaks over time. Project is include City of Mankato Fiscal Year 2024-2028 ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The reconstruction of Rita Road from Monks Avenue to End. As January 20, 2023, this project is currently in the FY 2023 - 2027 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$1,639,856.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
1
Bidding Soon
815
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2029

Project location map

Rita Rd, Mankato, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.