BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 20, 2022 at 8:00 PM

Updated October 24, 2023

Site work and paving for a road / highway in Chipley, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Scope - These project(s) consist of stabilizing existing roadways; construction of geotextile, base, and asphalt; reworking existing grassed shoulders; regrading ditches as necessary; driveway turnout construction; signing and pavement markings; and providing other rehabilitation and restoration activities as necessary. ITB 2022-07: Bess Nook Rd, Lee Rd, Brackin Rd and Cutoff Rd, Contract Time of 180 days Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from other sources. Questions regarding the bid Documents shall be emailed to Kimberly Birge-Gorman at kbirge@washingtonfl.com. The deadline for questions is Friday, March 11, 2022, by 3:00 pm local time. A pre-bid conference will not be held for this project. Bidders shall be licensed contractor (if applicable) and shall be pre-qualified with the Florida Department of Transportation in accordance with FDOT Standard Specifications for Road and Bridge Construction, Section 2- Proposal Requirements and Conditions. No Bid shall be withdrawn for a period of sixty (60) days after scheduled time for the receipt of the bids. The Owner reserves the right to waive any or all irregularities and informalities and to reject any or all bids.

Post-Bid

Roads / Highways

$200,000.00

Public - County

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2022

April 21, 2022

Project location map

Multiple Locations, Chipley, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.