Renovation of a mixed-use development in Schenectady, New York. Completed plans call for the renovation of a swimming pool.

The bidding documents may be examined, free of charge, at the office of Mosaic Associates Architects, The Frear Building, 2 Third Street, Suite 440, Troy, New York 12180, telephone (518) 479-4000. Digital Bidding Documents: Complete digital sets of Bidding Documents may be obtained online as a download for a forty-nine ($49.00) non-refundable deposit at Mosaic Associates Architects website. The deposit will be refunded ONLY to those bidders who submit a bona fide bid proposal in accordance with the terms in the "Information for Bidders" and who return a complete set of Bidding Documents in COMPLETE, UNMARKED, and NOT TORN condition to REV within thirty (30) days after the award of contract(s) covered by such Bidding Documents, or the rejection of such bid(s). Non-bidders, including material suppliers and subcontractors, as well as plan holders who do not submit bid proposals, WILL NOT be eligible for a refund. Addenda: All bid addenda will be transmitted to registered plan holders via email and will also be available at website. Plan holders who have paid for hard copies of the bidding documents will need to make the determination if hard copies of the addenda are required for their use, and coordinate directly with REV for hard copies of addenda to be issued. There will be no charge for registered plan holders to obtain hard copies of the bid addenda.

Bid Results

Swimming Pools

$355,000.00

Public - City

Renovation

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Photographic Documentation, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber, Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal and Moisture Protection, Maintenance of Membrane Roofing, Dampproofing and Waterproofing, Thermal Protection, Steep Slope Roofing, Roof Tiles, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Hardware, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Wall Finishes, Wall Coverings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
87
Bidding Soon
1,397
All Active Projects
653
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2022

April 18, 2022

img_map_placeholder

1445 The Plaza, Schenectady, NY

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Schenectady High School Pool Dehumidification Reconstruction Project - Mechanical

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.