BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 21, 2022 at 8:00 PM

Updated July 1, 2025

Site work and paving for a civil project in Loch Sheldrake, New York. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; water / sewer project; and water / sewer project.

The project involves replacement of two (2) existing corrugated metal pipe culverts on Maplewood Avenue crossing Sheldrake Stream with a 2'-6" H x 12'-0" W Three-Sided Concrete Box Culvert. Replacement of culvert will require installation of a temporary detour road, temporary bypass pumping of existing sanitary sewer and provide new watermain, and removal and replacement of existing water and sewer main. The stream bed at the inlet and outlet will be protected with a light stone fill to dissipate energy and prevent scour. A natural stream bed material will be placed along the full alignment of the culvert. The section of Maplewood Avenue disturbed by construction will be paved as indicated on the drawings. Cofferdams and other erosion and sediment control measures will be used to prevent erosion to the stream and sediment in the lake. The work shall be bid on a lump sum basis, with the Contract awarded to the lowest responsible Contractor . The Town of Fallsburg strongly encourages MBE, WBE and Section 3 firms to bid. The Owner reserves the right to waive irregularities and to reject any or all bids. The Contractor shall include with his proposal, a signed "Statement of Non-Collusion" in the format contained herein. The $50.00 deposit will be refunded to those who submit a bid and return the complete set of documents in good order, to the Architect, within 30 days following the bid opening. Non-bidders including suppliers and subcontractors will not be eligible for refund. Viewing Procurement and Contracting Documents: Examine at the locations below: Keystone Associates Architects, Engineers and Surveyors, LLC 58 Exchange Street Binghamton, New York 13901 Phone: (607) 722-1100 Town of Fallsburg Town Clerk's Office 19 Railroad Plaza, Post Office Box 2019 South Fallsburg, New York 12779 Phone: (845) 434-8810 Ext. 1

Post-Bid

Bridges / Tunnels

$550,000.00

Public - City

Paving, Site Work

9

22

8

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
670
Active Projects
364
Bidding Soon
5,392
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2022

April 22, 2022

Project location map

Maplewood Ave, Loch Sheldrake, NY


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.