Published October 16, 2024 at 8:00 PM

Updated October 17, 2024

Site work and renovation of a military facility in Oakland, California. Completed plans call for the renovation of a military facility; and for site work for a military facility.

Reference Number 0000353841 The Engineer's estimate for this project is $8,828,000 The Work of this 1,280 calendar day project consists generally of furnishing all labor, materials, appliances, tools, equipment, transportation, services, and supervision required to replace existing switchgear SS-R-14 at the end of its service life with a new switchgear SS-R-10, including, but not limited to, redeveloping an existing industrial site to become the new location for SS-R-10. This redevelopment will include the removal and demolition of existing buildings and canopy; site grading; and the procurement and installation of a new switchgear, including the installation of associated underground conduits, vaults, cable, overhead work, and all other electrical equipment necessary to successfully deliver a complete system. Work also includes the installation of site pavement, security fence, lighting, a bioretention basin, and the removal of existing switchgear SS-R-14 following the successful construction and commissioning of the new switchgear SS-R-10. All Work must be performed in accordance with the Contract Documents. Question Deadline 08/23/2024 at 5:00 PM PT For questions pertaining to the download of the Plans and Project Manual, please contact Bill Russell at (510) 627-1439 or at brussell@portoakland.com. For technical questions, in respect to the Bidding Documents, Bidders should contact Joyce Huang at (510) 926-9815 or at jhuang@portoakland.com. Bonding Requirements: A Performance Bond and a Payment Bond are required for this contract. License, DIR Requirements, and CARB Certification: A California Class A contractor's license is required prior to award of this Contract. Joint ventures must secure a joint venture license prior to award of this Contract. *The Port specifically reserves the right, in its sole discretion, to reject any or all Bids, to re-bid, or to waive inconsequential defects in bidding not involving time, price or quality of the Work. site visit note's -- Bidders who wish to participate in the site tour must notify Joyce Huang at jhuang@portoakland.com no later than 9:00 AM on July 16, 2024, to confirm.

Award

Military

$10,911,545.00

Public - City

Renovation, Site Work

310

40

8

7

Subscribe For Documents

83 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Warranties, Project Record Documents, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Demolition, Selective Structure Demolition, Site Remediation, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation, Lead Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Metal Decking, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Shop-Fabricated Structural Wood
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Windows, Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Flooring, Resilient Flooring, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Fireplaces and Stoves, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Postal Specialties, Exterior Specialties, Flagpoles
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Loading Dock Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics, Furnishings and Accessories, Portable Lamps, Lamps, Furniture, Seating, Chairs, Multiple Seating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Medium-Voltage Cables, Commissioning of Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Distributed Communications and Monitoring Systems, Distributed Systems, Clock Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Commissioning of Earthwork, Geotechnical Instrumentation and Monitoring of Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Shoring and Underpinning, Shoring, Timber Shoring, Special Foundations and Load-Bearing Elements, Driven Piles, Concrete Piles, Bored Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Retaining Walls, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Service Connections, Water Utility Storage Tanks, Fuel Distribution Utilities, Natural-Gas Distribution, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation, Guideways/Railways, Rail Tracks, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Hooks, Lifts, Mobile Plant Equipment, Mobile Earth Moving Equipment, Graders
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
390
Active Projects
181
Bidding Soon
3,257
All Active Projects
1,491
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2024

October 29, 2024

img_map_placeholder

2502 W 14th St, Oakland, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.