BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Largo, Florida. Completed plans call for the renovation of a educational facility.

Provide all labor, materials and performing all work necessary for the completion of removing existing pneumatic control actuator and replace with new direct digital control (DDC) actuator. The new actuator will be integrated to the existing controls interface. Provide new cabling for new actuator and maintain the same sequence of operation. The existing pneumatic actuator system shall remain operational until all dampers have been retrofitted. All work plans and specifications were prepared by SGM ENGINEERING. The prime Contractor shall be a Florida licensed Mechanical Contractor. Note: The Largo Administration Building is now a secured building effective December 1, 2015 and visitor procedures have changed. Inform the officer at the front desk that you have a bid to be delivered to the Purchasing Department. The officer will call Purchasing and someone from the department will come to the front desk to date and time stamp your bid and provide a receipt. This process may take several minutes, so please allow sufficient time when hand delivering a bid submittal. We apologize for any inconvenience this may cause you, but it is imperative that all information be disseminated in a public forum with all potential Bidders present to minimize confusion or misunderstandings. Additions or changes to the original bid documents resulting from this conference of a material nature, will be documented in the form of written addenda and distributed to all attendees. Please note that if you are late to this mandatory pre-bid conference you will not be eligible to sign the attendance roster and therefore may not submit a bid. You may still, however, attend the conference if you wish.

Post-Bid

Educational

$125,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
257
Active Projects
108
Bidding Soon
1,986
All Active Projects
770
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 24, 2022

April 25, 2022

October 22, 2022

img_map_placeholder

11111 Belcher Rd, Largo, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.