Published March 29, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in State College, Pennsylvania. Completed plans call for the renovation of a playground / park / athletic field; 31,000-square-foot laboratory facility; and municipal facility.

Award Details Contract Award Date: Mar 27, 2023 Contract Award Number: W912DR23C0009 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: MEHYZUVJPEJ3 Contractor Awarded Name: Leonard S. Fiore, Inc. Contractor Awarded Address: Altoona, PA 16602-1205 USA Base and All Options Value (Total Contract Value): $17,803,000.00 UPDATED 04 OCTOBER 2022: Official solicitation can be found at the following link. Within that link, solicitation, attachments and amendments can be found at the link at the end of the description section. https://sam.gov/opp/b205d843b4764d8687b65e136d9da427/view Project Name: USDA-ARS University Park Renovation - Pasture Systems Watershed Management Research Unit (PSWMRU), University Park, Pennsylvania Project Description: The renovation and modernization of the Pasture Systems and Watershed Management Research Unit (PSWMRU) Buildings 0001, 0002, 004, & 005, on the Penn State campus. The scope of the project comprises of the renovation of approximately 31,000 GSF of Biosafety Level Tw o (BSL2) Laboratory / Office / Headhouse and Greenhouse facilities. The base bid for the project includes complete interior demolition and new construction of the interior administrative areas, laboratories, and headhouse. The proposed procurement is Full and Open Competition (Unrestricted); NAICS 236220 - Commercial and Institutional Building Construction, w ith a size standard of $39,500,000.00. Magnitude of Construction: Betw een $10,000,000.00 and $25,000,000.00. This is a Firm-Fixed Priced, Design-Bid-Build Construction Contract utilizing the Best Value Tradeoff Process. Contractors are requested to review requirements and instructions for a Design-Bid-Build selection in response to this RFP. STATEMENT OF WORK The USDA University Park Renovation includes the Design-Bid-Build renovation and modernization of the Pasture Systems Watershed Management Research Unit (PSWMRU) Buildings 001, 002, 004, and 005, located at University Park, PA (near Penn State Campus). The scope of the project comprises the renovation of approximately 31,000 GSF of Biosafety Level Two (BSL2) Laboratory / Office / Headhouse and Greenhouse facilities. The base bid for the project includes complete interior demolition and new construction of the interior administrative areas, laboratories, and headhouse. Bid options include one greenhouse renovation in-kind; and window replacement. Offerors must quote on all items including Optional Items. Failure to quote on all items may be cause for rejection of the proposal. Optional Items may be exercised at any time within 180 calendar days after Notice to Proceed. The Contracting Officer may exercise the Optional Items by written notice to the Contractor, postmarked within the period specified above. The Government may exercise any, all or none of the listed Optional Items in any order. No additional time for contract completion will be allowed when an Optional Item is exercised. EVALUATION OF OPTIONS: Except when it is determined not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s). IMPORTANT NOTES REGARDING THIS ACQUISITION 1. PROPOSAL CONDITIONS a. Contractors must provide all required documents and bid all items in the above price schedule, with no exceptions. Should a contractor fail to fully complete the price schedule, its offer will not be considered responsive to the solicitation and ineligible for the resultant contract award. b. Split awards or multiple award contracts will not result from this solicitation. 2. COMPETITION: Full and Open Competition 3. SUBMISSION OF PROPOSALS a. All proposals must be submitted in accordance with the electronic requirements detailed in the Solicitation Proposal section. PROPOSALS OR MODIFICATIONS TO PROPOSALS THAT ARE RECEIVED BY FACSIMILE WILL NOT BE CONSIDERED. b. Hand Carried and Mailed Proposal: Hand carried and mailed proposals are not required. See Solicitation Proposal section for directions on how to submit proposals electronically. c. SF 1442 BACK (Page 2 of the Solicitation): Offerors are required to acknowledge the receipt of all amendments to the Solicitation on the Standard Form 1442 in Block 19. Offerors shall fully complete all the required areas located under the section designated as "OFFER" (refer to Items 14 through 20C). d. BID GUARANTEE: The offerors are required to submit a Bid Guarantee for this procurement during proposal submissions. Any offeror failing to submit an authentic Bid Guarantee will be considered non-responsive to the Solicitation and ineligible for award. The Bid Guarantee shall be in the amount of 20% of the bidder's price or $3,000,000.00, whichever is less. e. BONDS AND INSURANCE: The Contractor will be required to furnish proof of insurance, including copies of the required endorsements, and performance and payment bonds within ten (10) calendar days following the Contractor's receipt of the contract award. 4. . REQUESTS FOR INFORMATION Technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org) No Later Than (NLT) 11:00 A.M. (EST), 28 September 2022. To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email. Another email to the same address will notify the prospective vendor once the reply is available for viewing. The Bidder Inquiry Key is: 843G3H-EXKBZ2 **********Amendment 0003: The purpose of this amendment is to update the Request for Information (RFI) due date in the Instructions to Offerors section. RFI due date updated to 09 November 2022 at 11:00 AM EDT. Also, full site visit sign-in sheet provided. **********Amendment 0002: The purpose of this amendment is to update clause 52.236-2 ALT I which provides information for a second site visit. The Request for Information (RFI) due date has been extended to 09 November 2022. The proposal due date has been extended to 30 November 2022. Updated wage determination has been provided.***********Site visit sign-in sheet provided*****************Amendment 0001:The purpose of this amendment is to extend the Request for Information (RFI) due date from 11:00 AM 28 September 2022 to 11:00 AM 12October 2022.*****************The objective of this project is the renovation and modernization of the Pasture Systems and Watershed Management Research Unit, PSWMRU, Buildings 0001, 0002, 004 and 005 on the Penn State campus. The scope of the project comprises of the renovation of approximately 31,000 GSF of Biosafety Level two, BSL2, Laboratory, Office, Headhouse and Greenhouse facilities. The base bid for the project includes complete interior demolition and new construction of the interior administrative areas, laboratories and headhouse. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml solNo=W912DR22R0034' to obtain more details.* *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Playgrounds / Parks / Athletic Fields

$17,803,000.00

Public - Federal

Renovation

322

30

4

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Field Samples, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Fire Protection, Construction Facilities, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Environmental Controls, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Warranties, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation, Lead Remediation, Polychlorinate Biphenyl Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Post-Tensioned Concrete, Concrete Curing, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry, Clay Unit Masonry, Brick Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing, Metal Joists, Steel Joist Framing, Metal Decking, Steel Decking, Steel Roof Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Framing, Sheathing, Underlayment, Finish Carpentry, Architectural Woodwork, Wood Frames, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Thermal Insulation, Exterior Insulation and Finish Systems, Roofing and Siding Panels, Siding, Membrane Roofing, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Fire and Smoke Protection, Firestopping, Joint Protection, Preformed Joint Seals, Compression Seals, Joint Sealants, Expansion Control
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows, Aluminum Windows, Wood Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Louvers, Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Lath, Metal Lath, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Resilient Tile Flooring, Static-Control Resilient Flooring, Terrazzo Flooring, Fluid-Applied Flooring, Resinous Flooring, Carpeting, Wall Finishes, Wall Coverings, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Directories, Signage, Plaques, Interior Specialties, Partitions, Wall and Door Protection, Corner Guards, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Fireplaces and Stoves, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies, Exterior Specialties, Protective Covers, Other Specialties, Flags and Banners, Flags, Scales
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Computers, Educational and Scientific Equipment, Audio-Video Equipment, Laboratory Equipment, Collection and Disposal Equipment, Solid Waste Handling Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Window Shades, Roller Window Shades, Casework, Manufactured Metal Casework, Furnishings and Accessories, Portable Lamps, Lamps, Bedroom Furnishings, Blankets, Furnishing Accessories, Bowls, Rugs and Mats, Rugs, Runners, Furniture, Seating, Chairs, Residential Furniture, Beds, Multiple Seating, Pews and Benches, Benches, Other Furnishings, Site Furnishings, Bicycle Racks, Trash and Litter Receptors
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains, Special Purpose Rooms, Special Activity Rooms, Saunas, Special Structures, Fabricated Engineered Structures, Glazed Structures, Integrated Construction, Radiation Protection, Lead Sheet
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Elevator Equipment and Controls, Elevator Equipment, Lifts, Scaffolding, Other Conveying Equipment, Facility Chutes
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, Facility Fuel Systems, Facility Fuel Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Flexible Connectors, HVAC Fans, Air Terminal Units, Air Outlets and Inlets, Ventilation Hoods, Fume Hoods, Central Heating Equipment, Heat Exchangers for HVAC, Central Cooling Equipment, Packaged Water Chillers, Cooling Towers, Liquid Coolers, Central HVAC Equipment, Evaporative Air-Cooling Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Convection Heating and Cooling Units, Radiators, Convectors, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Transfer Switches, Automatic Transfer Switches, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Cement and Concrete for Earthwork, Earth Moving, Off-Gassing Mitigation, Radon Mitigation, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Treatment, Termite Control, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Pruning, Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Flexible Paving, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Retaining Walls, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Storm Drainage Utilities, Culverts, Pipe Culverts, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Lifting Devices, Clamps, Hooks, Lifts, Manufacturing Equipment, Machining Equipment, Drilling Equipment, Assembly and Testing Equipment, Applicators, Material Storage, Storage Equipment and Systems, Storage Cabinets
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
37
Bidding Soon
590
All Active Projects
227
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2022

January 30, 2023

img_map_placeholder

To Be Determined, State College, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

US Department of Agriculture (USDA) Agricultural Research Service, University Park Renovation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.